KERJA – KERJA MEMBAIKPULIH BUMBUNG

DOKUMEN

MEJA

TERKAWAL

Harga Jumlah Harga Jumlah Harga Jumlah

(RM) (RM) (RM) (RM) (RM) (RM)

Removal Works

a. Existing roof finishing M2 1600

b. Existing roof structure M2 1600

c. Existing old fascia board M 500

d. Existing gutter M 450

e. Existing rainwater downpipes M 690

f. Existing external and internal asbestos ceiling M2 1500 Carefully remove and dismantle all existing works at

main roof and all necessary works of Block A,C & D where indicated and properly stack and store where directed and including make good revelas to match existing, make good all works disturbed and remove all debris to contractor's own dumping ground

JUMLAH DIBAWA KE JUMLAH TERKUMPUL

KERJA-KERJA MENGGANTIKAN BUMBUNG DAN KERJA-KERJA BERKAITAN DI BLOK A, C & D PROJEK PERUMAHAN RAKYAT (PPR), JALAN PEKAKA 8/1, KOTA DAMANSARA SEKSYEN 8, PETALING JAYA, SELANGOR

BILL NO. 2 -KERJA-KERJA MENGGANTIKAN BUMBUNG

Bil Perihal Unit Kuantiti

BLOK D

BLOK A BLOK C

B2/1

Harga Jumlah Harga Jumlah Harga Jumlah

(RM) (RM) (RM) (RM) (RM) (RM)

KERJA-KERJA MENGGANTIKAN BUMBUNG DAN KERJA-KERJA BERKAITAN DI BLOK A, C & D PROJEK PERUMAHAN RAKYAT (PPR), JALAN PEKAKA 8/1, KOTA DAMANSARA SEKSYEN 8, PETALING JAYA, SELANGOR

BILL NO. 2 -KERJA-KERJA MENGGANTIKAN BUMBUNG

Bil Perihal Unit Kuantiti

BLOK D

BLOK A BLOK C

Installation Works Notes:

2. Prices for the lightweight mild steel roof C-channel trusses shall include for all mild steel members, wall plates, connection plates, bolts, nuts and washer, painting or treatment of plates, design fees, fabrication and including providing ten (10) years written manufacturer's guarantee

3. The Tenderer is requested to submit shop drawings, specification and calculation sheet document to S.O. for approval prior to fabrication and installation. Only designs from specialist Proprietary Roof Trusses Manufacturer's together with their

JUMLAH DIBAWA KE JUMLAH TERKUMPUL 1. Notwithstanding to the Standard Method of Measurement, this item is measured flat on plan of roof area in Square Meter (M2). The Tenderer shall allow for all cost in connection therewith.

B2/2

Harga Jumlah Harga Jumlah Harga Jumlah

(RM) (RM) (RM) (RM) (RM) (RM)

KERJA-KERJA MENGGANTIKAN BUMBUNG DAN KERJA-KERJA BERKAITAN DI BLOK A, C & D PROJEK PERUMAHAN RAKYAT (PPR), JALAN PEKAKA 8/1, KOTA DAMANSARA SEKSYEN 8, PETALING JAYA, SELANGOR

BILL NO. 2 -KERJA-KERJA MENGGANTIKAN BUMBUNG

Bil Perihal Unit Kuantiti

BLOK D

BLOK A BLOK C

Installation Works (Cont'd) Notes (Cont'd):

ROOF TRUSSES

a. Roof Area (measured flat on plan) ; approximately M2 1600 70.0m high above ground floor level (max)

4. During erection the work shall be securely bolted or otherwise fastened and if all necessary temporary braced so as to make adequate provision for all erection stresses including those due to the erection equipment and it's operation. Neither permanent bolting or field welding shall be done until proper alignment has been obtained.

5. All surfaces to be painted shall be thoroughly prepared prior to application of painting works.

Design, fabricate, supply, deliver, unload, hoisting and fixing all fabricated mild steel C-channel roof trusses as described in accordance to manufacturer's specifications.

JUMLAH DIBAWA KE JUMLAH TERKUMPUL

B2/3

Harga Jumlah Harga Jumlah Harga Jumlah

(RM) (RM) (RM) (RM) (RM) (RM)

KERJA-KERJA MENGGANTIKAN BUMBUNG DAN KERJA-KERJA BERKAITAN DI BLOK A, C & D PROJEK PERUMAHAN RAKYAT (PPR), JALAN PEKAKA 8/1, KOTA DAMANSARA SEKSYEN 8, PETALING JAYA, SELANGOR

BILL NO. 2 -KERJA-KERJA MENGGANTIKAN BUMBUNG

Bil Perihal Unit Kuantiti

BLOK D

BLOK A BLOK C

Installation Works (cont'd) ROOF FINISHES

a. Roof covering at 25 degree pitch M2 1600

b. Extra over for ridge capping M 350

---c. M 400

d. M 500

Wrot pressure treated Grade 'B' timber as described including all necessary fixing accessories and painting to all exposed surface of timber

250 mm x 20 mm Thick fascia board fixed to end of of trusses and including painting works

Supply and install '"MONIER" or other equivalent and approved concrete roofing tiles of approved standard colour laid with 75mm laps on existing timber trusses and fixed all in accordance to the manufacturer's instructions

Approved 16 gauge zinc sheet flashing and fixing into party wall and the other end dressed over roof tiles as per SO instruction

JUMLAH DIBAWA KE JUMLAH TERKUMPUL

B2/4

Harga Jumlah Harga Jumlah Harga Jumlah

(RM) (RM) (RM) (RM) (RM) (RM)

KERJA-KERJA MENGGANTIKAN BUMBUNG DAN KERJA-KERJA BERKAITAN DI BLOK A, C & D PROJEK PERUMAHAN RAKYAT (PPR), JALAN PEKAKA 8/1, KOTA DAMANSARA SEKSYEN 8, PETALING JAYA, SELANGOR

BILL NO. 2 -KERJA-KERJA MENGGANTIKAN BUMBUNG

Bil Perihal Unit Kuantiti

BLOK D

BLOK A BLOK C

Installation Works (cont'd) ROOF ACCESSORIES

a. M 450

b. M 620

c. M 70

JUMLAH DIBAWA KE JUMLAH TERKUMPUL 100 mm Diameter rainwater downpipes fixed to wall or concrete columns and floor including holderbats, bends and other accessories

230 mm wide UPVC gutter complete with bracket and all necessary accordance with the manufacturer's instruction

UPVC rainwater downpipes and fittings as specified fixed and jointed all in accordance with the manufacturer's instructions including bends

150 mm Diameter rainwater downpipes fixed to wall or concrete columns and floor including holderbats, bends and other accessories

B2/5

Harga Jumlah Harga Jumlah Harga Jumlah

(RM) (RM) (RM) (RM) (RM) (RM)

KERJA-KERJA MENGGANTIKAN BUMBUNG DAN KERJA-KERJA BERKAITAN DI BLOK A, C & D PROJEK PERUMAHAN RAKYAT (PPR), JALAN PEKAKA 8/1, KOTA DAMANSARA SEKSYEN 8, PETALING JAYA, SELANGOR

BILL NO. 2 -KERJA-KERJA MENGGANTIKAN BUMBUNG

Bil Perihal Unit Kuantiti

BLOK D

BLOK A BLOK C

OTHER WORKS

a. M2 1500

JUMLAH DIBAWA KE JUMLAH TERKUMPUL

JUMLAH TERKUMPUL

Dari Muka Surat B2/1 Dari Muka Surat B2/2 Dari Muka Surat B2/3 Dari Muka Surat B2/4 Dari Muka Surat B2/5 Dari Muka Surat B2/6

1200mm x 600mm including painting and framing horizontal (external, internal and lift motor room)

JUMLAH DIBAWA KE RINGKASAN TENDER Suspended ceiling as specifed asbestos free cement ceiling sheet with concealed frame including all timber beading fixed as per manufacturer's details and specifications

B2/6

Harga Jumlah Harga Jumlah Harga Jumlah

(RM) (RM) (RM) (RM) (RM) (RM)

a M2 1200 60.00 72,000.00 60.00 72,000.00 60.00 72,000.00

b LS 12,000.00 12,000.00 12,000.00

c LS 20,000.00 20,000.00 20,000.00

104,000.00

Kerja - kerja melepa semula permukaan lantai yang retak serta membekal dan meletakkan satu (1) lapisan kalis air di permukaanflat roof termasuk kerja - kerja yang berkaitan

Kerja - kerja membaikpulih semula party wall yang rosak termasuk kerja - kerja menampal dinding yang retak, mengecat semula permukaan party wall dan kerja-kerja lain yang berkaitan

Kerja - kerja membuka dan memasang semula pendawaian termasuk aksesori dan kerja - kerja yang berkaitan bagi setiap unit rumah di tingkat paling atas dan kawasan gunasama

JUMLAH DIBAWA KE RINGKASAN TENDER 104,000.00 104,000.00

Bil Perihal Unit Kuantiti

KERJA-KERJA MENGGANTIKAN BUMBUNG DAN KERJA-KERJA BERKAITAN DI BLOK A, C & D PROJEK PERUMAHAN RAKYAT (PPR), JALAN PEKAKA 8/1, KOTA DAMANSARA SEKSYEN 8, PETALING JAYA, SELANGOR

BILL NO. 3 - KERJA-KERJA LAIN

BLOK A BLOK C BLOK D

B3/1

BORANG-BORANG MAKLUMAT