UNIVERSITI SAINS MALAYSIA
Second Semester Examination Academic Session
200812009AprillMei 2009
EBS 219/3 - Introduction to Mining Engineering
IP e n ge n al an
Kep ada
Kej urute
raan
P e rl o m b o n g an]
Duration
:3 hours [Masa
: 3jam]
Please ensure that this examination paper contains SIX printed pages before you begin the examination.
[Sila pastikan bahawa
kertaspeperiksaan ini mengandungi ENAM muka surat yang bercetak sebelum anda memulakan peperiksaan ini.l
This paper contains SEVEN questions.
[Kertas soalan ini mengandungi TUJUH soalan.]
lnstruction: Answer FIVE questions. lf candidate answers more than five questions only the first five questions answered in the answer script would
beexamined.
[Arahan: Jawab LIMA soalan. Jika calon menjawab lebih daipada lima soalan hanya lima soalan pertama mengikut susunan dalam skrip iawapan akan dibei markah.l
Answer to any question must start on a new page.
[Mutakan
jawapan anda untuk setiap
soalanpada muka surat yang baru.]
You may answer a question either in Bahasa Malaysia or in English.
[Anda dibenart<an menjawab soalan sama ada dalam Bahasa Malaysia atau
Bahasa Inggeris.l
I
IEBS 21sl
-2-
1. tal
Discuss, with the aid of diagrams, the phases of development for the followingmining techniques
andstate a
mineralwhich is
commonly extracted using each of the following techniques:(i)
open Pit mining(ii)
quarrying(iii)
underground miningHuraikan, dengan bantuan
gambarajah,fasa
perkembanganuntuk
kaedah perlombonganyang
berikutdan
sebutkansatu
mineralyang
biasa dilombongmen ggunakan s e,t iaP kae dah b e r i kut :
(,
lombong dedah(ii)
kuari(ii,
lombong bawah tanah(15 marks/markah)
tbl Deliberate on the advantages and disadvantages in the usage of the
3 mining techniques in question 1 (a).Bincangkan kelebihan dan kekurangan 3 jenis kaedah perlombongan dalam soalan
I
(a).(5 marks/narkah)
2. tal
Discuss,with
diagrams;the
differenttypes and
methodology inthe
usage of the followingmineral prospecting techniques
for exploration:(i)
geochemical ProsPecting,(ii)
geoPhYsical ProsPecting,Terangkan, dengan gambarajah; pelbagai jenis dan kaedah kegunaan
teknikleknik
prospek mineral yang berikut untukfasa carigali:(,
kaedahprospek geofizik,IEBS 21el
-3-
tbl Give your opinion on the benefits in the usage of the above
prospecting systems discussed in section 2 [a].Berikan pandangan andq tentang kelebihan kegunaan pelbagaijenis sistem prospek yang telah disebutkan dalam seksyen 2 [aJ.
(5 markslmarkah)
3. tal
Discuss the variables which need to be taken into account in theselection of an appropriate mining method
for any mineral development pro.;ect.Bincangkan pembolehubah yang
perlu
dipertimbangkan dalam pemilihan kaedah perlombongan yong sesuai untuk sebarang projek perkembangan mineral.(10 marks/markah)
tbl
Describe,with the
aidof
diagrams,the
appropriatesurface mining method
which can be used for the efficient mineral extraction of a mineral deposit with the following characteristics :ore: coal
(Bituminous);shape of
deposit:tabular (10 m
thickness), Grade:medium, Size: larqe (12 million tonnes), Depth of deposit: Shallow (5 m), Dip of deposit: horizontal
Bincangkan, dengan bantuan gambarajah, kaedah perlombongan permukaan yang sesuai cligunakan untuk perlombongan mineral secara cekap untuk mendapan bijih dengan ciri-ciri yang berikut:
Bijih:
batu arang (Bitumed; Saiz mendapan: lapisan tebal (ketebalanl0
nl)' Gred"sederhana,
saiz:
besar (12juta
to4). Kedalamanmendapan:
cetek (5 m)'Kecerunan mendapan: rata
(10 marks/markah)
IEBS 21eI 4
4. tal Describe, with the aid of diagrams, how the following traditional
statistical techniques are commonty used inore reserye evaluation:
(i)
PolYgonal Method(ii)
Triangular Method(iii)
Inverse Distance MethodHuraikan, dengan bantuan gambarajah, bagaimana knedah statistik yang berkenaan digunakan dalam fasa penilaian rizab
bijih:
(,
Kaedah Penilaian Poligon(i,
Kaedah Penilaian Segitiga(ii,
Kaedah Jarak Songsang(15 marks/markah)
tbl
Elaboratethe
variousphases in the Geostatistical ore reserve evaluation
phase of a prospective mineral deposit.Huraikan fasa yang perlu dilaksanakan dalam kaedah Geostatistik untuk penilaian rizab sesuatu mendaPan mineral.
(5 marks/zrarkah)
5. tal As a planning engineer, discuss the variables to be considered in
theeffective selection of
anequipment for
a mine or quarry'Sebagaijurutera perancangan, huraikan pembolehubah yang perlu dipertimbangkan dalam pemitihan peralatan yang cekap untuk sesuatu lombong atau kuari.
(5 markslmarkah)
IEBS 21el
-o-
Clbl Discuss the advantages and limitations in the usage of the
following equipment at a mineral production site.(i)
truck(ii)
belt conveyor(iii)
shovelBincangkan kelebihan dan kekurangan dalam kegunaan peralatan yang berikut di
t apak p enge luar an mineral :
(i) Iori
(i,
tali sswat(iii)
'shovel'(10 marks/markah)
tcl
Calculatethe number of truck fleet units required, for
a 91 tonne truck with 9 m3 shovel; given the following specifications:Company's Annual production = 31,750,000 tonnes Annual operating hour = 5000 hours
Production rate = 220 tonnes/hr
Kirakan
jumtah
buahlori
yang diperlukanjika
tapak menggunakan lorijenis 9l
tonne dengan penyodok 9 m3 shovel; dengan ciri-ciri yang berikut.
Keluaran tahunan syarikat
:
31 ,7 50,000 tonnes Jam kerja/tahun:
5000jamKadar pengeluaran
:
220 ton/hr(5 marks/zrarkah)
7
lal
6.
-6-
Discuss
the major mineral processing
concepts, for efficient separation of the valuable mineral fromIEBS 21el
and the
equipment used, the gangue.lbl
Huraikan
konsep pemprosesanmineral yang
utclma,serta alatan yang
dapat digunakan, untuk proses pengasingan mineral bernilai daripada mineral reja.(10 marks/markah)
Elaborate on the various factors that should be considered in the
selection of
anappropriate explosive
for rock fragmentation in quarrying'Bincangkan
faktir
yang perltt ditimbangkan dalam pemilihanbthon
letupan yang sesuai untnk pemecalun batuctn di kuari.(10 marks/markah)
Discuss how excessive dust inhalation affects the health of workers
and describe, with diagrams, adust monitoring equipment
popularly used in the industry to reduce the environmental impact of excessive industrial dust.Huraikan bagaimana penafosan debu berlebihan mengancam kesihatan pekerja dan bincangkan, dengan bantuan gambaraiah, dan satu
ienis
sistem pengawosan debuyang
biasa digunakan dalamindustri
untuk mengurangkan impakalam
sekitar daripada keadaan debu industri berlebihan.(15 marks/markah)
Discuss the various Occupational Safety and Health measures that
you should consider as an engineer for the efficient safe management of a quarry.Bincangkan
nilai-nilai
Keselnmatanrlan
Kesihatsn Pekeriaon yangperlu
andaperlimbangkan sebagai jurutera untuk pengtn"usan sebuah kuari dengan cekap.
(5 markslmarkah)
lal
7.
lbl