SITE WASTE MANAGEMENT PLAN IN CONSTRUCTION INDUSTRY

MUHAMMAD SYAFIQ BIN MOKHTAR (2012823748)

Academic Project submitted in partial fulfillment of the requirements For the degree of

Bachelor of Building Surveying (Hons) Centre of Studies for Building Surveying Faculty of Architecture, Planning & Surveying

July 2015

(2)

UNIVERSITI TEKNOLOGI MARA

SITE WASTE MANAGEMENT PLAN IN CONSTRUCTION INDUSTRY

“I hereby declare that this academic project is the result of my own research except for the quotation and summary which have been

acknowledged”

Student’s Name : Muhammad Syafiq bin Mokhtar

Signature :

UITMNo. : 2012823748

Date : July 10th , 2015

(3)

ABSTRACT

Waste disposal problem at the construction site to the impact on developing countries. Disposal of this waste not only affect the view at the construction site, but affect the health of workers .The strategic waste management must be implemented to ensure that developers and contractors can manage solid waste on construction sites in a systematic way, while giving an advantage to the environment. Thus, this dissertation true intention is to know about the regulation and implementation of waste management plan. This dissertation also to identify the factor that contributes to the waste management in construction industry and to determine the best method of waste management that applied on that waste management plan. Taking place in Malaysia, the area of case study of this dissertation is in flat area in Negeri Sembilan..

(4)

I take this opportunity to thank my supervisor, Dr Norsalisma Binti Ismail who has been made her time helping me finish my dissertation through this one year. Also not to forget my group members which under the same supervisor that help a lot on reminding each other’s about datelines and other useful information. I also would like to thank my parent and my family where the support from them never end. I also want to place a record, my sense of gratitude to one and all ,who directly and indirectly have lend their hand helping me finish my dissertation including worker at Seremban Municipal Council and Ace Duplex Sdn Bhd.

(5)

1.1 Introduction

Based on Skoyles ER. Skoyles JR. (1987), waste consists of unwanted material or thing that produced directly or incidentally by the industries or construction includes building materials such stone, nails, and electrical wiring, , as well as waste originating from site preparation such as dredging materials, tree stumps, and rubble. Construction waste have lead, asbestos, or other hazardous substances. Building waste is made up of materials and thing such like bricks, concrete and wood damaged or materials that are not use for various purpose .

Based on Solid Waste Management On Tribal Land (2014), a site waste management plan (also known as an Integrated Waste Management Plan) is a document that show the ways how the waste materials will dispose .reduce and manage . A site waste management plan will assist and guide and control the implementation and development of a solid waste management program by setting the criteria for decision-making.

A site waste management plan is simply a plan that the amounts and the types of wastes that will be produced on the site. Site waste management also show how waste materials will be reused, recycled or disposed. Site waste management provide a good opportunity to streamline site activities and realise a number of business benefit including income and cost saving through reduced requirement for handling and materials storage(and better management for recovery or disposal.

According to MSK & Lesterose 2013 the aim of the site waste management is to improve the resource efficiency of the construction industry . They will achieve this in two ways that is firstly, by create on the savings in material and disposal costs already secured and promote the opportunities of of minimising them sources of waste, i.e. through resource efficient design and construction methods. Secondly by requiring those responsible for projects to forecast how much of each type of waste they will produce and to record how much will be reused or recycled.

3

Rujukan

DOKUMEN BERKAITAN

Last, respondents stated that after implementing BIM in minimizing construction waste in Malaysia, the construction industry in Malaysia can be pushed to a higher level

The total cost of a building includes all costs associated with the design, construction, operation, maintenance, rehabilitation and disposal or demolition of the asset at the end

(2005) stress that main labour productivity issues in Malaysian housing construction projects are lack of building materials at the construction sites, disruption of material

The purpose of review paper study is to proof the fertilizer that produced from the organic waste materials such as kitchen waste or residual waste able to supply enough nutrients

The survey results demonstrated that reusing or recycling for sorting different types of waste the other factors, using low waste technology, buying materials that have reuse

Pada tahun 1999, Kementerian Pelajaran telah menetapkan Komponen Sastera dalam Bahasa Inggeris sebagai satu keperluan untuk diajar kepada semua pelajar sekolah

Jika keseluruhan gandaan diset kepada 0.25, berapakah masa diperlulcan untuk sistem tersebut mengenap ke dalam lingkungan 2% nilai akhirnya bagi satu masukan rangkap

Sludge is known as waste material or dewatered solid from a commercial or industrial wastewater treatment plant and potable water treatment plants.. It consists