• Tiada Hasil Ditemukan

Data management in the Cloud: Limitations and Opportunities

N/A
N/A
Protected

Academic year: 2022

Share "Data management in the Cloud: Limitations and Opportunities"

Copied!
19
0
0

Tekspenuh

(1)

REFERENCES

Aaen, I. (2002, June 6-8). Challenging software process improvement by design.

Abadi, D. J. (2009). Data management in the Cloud: Limitations and Opportunities.

IEEE Computer Society Technical Committee on Data Engineering(Bulletin).

Abraham, A. (2011). Cisco Summit 2011: Capturing the Next Wave: Empowered for Business Success. Retrieved August 10, 2012, from

http://www.cisco.com/web/MY/ciscosummit2011/index.html

Adler, T. R., Scherer, R. F., & Black, J. A. (2011). A strategic conceptualization of the IT outsourcing decision and the role of teams. The Review of Business

Information Systems, 7(84-98).

Adnan, H., & Morledge, R. (2003, September 3-5). Joint venture projects in Malaysian construction industry factors critical to success. Paper presented at the 19th Annual ARCOM Conference, Reading.

Adobe. (2006). PDF Reference, version 1.23 (6th ed.): Adobe Systems Incorporated.

Afuah, A., & Werner, R. (2007, June 18-20). Technological change and the negative effects of embeddedness. Paper presented at the DRUID Summer Conference on Appropriability, Proximity, Routines, and Innovation, Copenhagen, CBS, Denmark.

Agarwal, S., & Kumar, J. S. (2011, 22 November). US market saturating, but IT spending seen growing in India. Livemint. Retrieved from

http://www.livemint.com/articles/2011/11/21222832/US-market-saturating-but- IT-s.html?atype=tp

Akintoye, A. (2000). Analysis of factors influencing project cost estimating practice.

Construction Management and Economics, 18, 77-89.

Akintoye, A., Goulding, J., & Zawdie, G. (2012). Construction Innovation and Process Improvement. West Sussex: Wiley-Blackwell.

Al-Ahmad, W., Al-Fagih, K., Khanfar, K., Alsamara, K., Abuleil, S., & Abu-Salem, H.

(2009). A Taxonomy of an IT Project Failure: Root Causes. International Management Review.

Alaghbandrad, A., Asnaashari, E., & Preece, C. (2012). Problems and Barriers of ICT Utilization on Iranian Construction Sites: Case Study on the Successful Use of ICT in Remote Construction Sites. Journal of Information Technology in Construction 17, 93-102.

Alkalbani, S., Rezgui, Y., Vorakulpipat, C., & Wilson, I. E. (2012). ICT adoption and diffusion in the construction industry of a developing economy: The case of the sultanate of Oman. Architectural Engineering and Design Management.

Alshawi, M., & Arif, M. (2011). Cases on e-readiness and information systems management in organisations: Tools for maximizing strategic alignment.

(2)

Alshawi, M., & Faraj, I. (2002). Integrated construction environments: technology and implementation. Construction Innovation, 2(1), 33-51.

Alshawi, M., & Salleh, H. (2011). IT/IS Readiness Maturity Model. In M. Alshawi &

M. Arif (Eds.), Cases on E-Readiness and Information Systems Management in Organizations: Tools for Maximizing Strategic Alignment (pp. 1-14). Salford:

IGI Global Publication.

Alwall, J., Ballestrero, A., Bartalini, P., Belov, S., Boos, E., Buckley, A., et al. (2007).

A standard format for Les Houches Event Files. Computer Physics Communications, 176(4), 300-304.

Ambler, S. W. (2010, April 1, 2010). Agile Maturity Model. Retrieved 22 June, 2011, from http://drdobbs.com/architecture-and-design/224201005

Andersen, E. S., & Jessen, S. A. (2003). Project maturity in organizations. International Journal of Project Management, 21, 457-461.

Apulu, I., & Latham, A. (2011). An evaluation of the impact of information and

communication technologies: Two case study examples. International Business Research, 4(3), 3-9.

Arsanjani, A., & Holley, K. (2005). Increase flexibility with the Service Integration Maturity Model. Technical Library Retrieved 11 November, 2011, from http://www.ibm.com/developerworks/webservices/library/ws-soa-simm/

Ashurst, C., Doherty, N. F., & Peppard, J. (2008). Improving the impact of IT development projects: the benefits realization capability model. European Journal of Information Systems, 17(4), 352-370.

Atkin, B. (1999). Innovation in the Construction Sector. Brussels: European Council for Construction Research.

Babbie, E. (2010). The Practice of Social Research (12 ed.). Belmont: Wadsworth, Cengage Learning.

Baddoo, N., & Hall, T. (2001). Motivators and de-motivators in software process improbement: an analysis of practitioner's view. Journal of Systems and Software, 62, 85-96.k

Baddoo, N., & Hall, T. (2003). De-motivators of software process improvement: an analysis of practitioner's views. Journal of Systems and Software, 66(1), 23-33.

Baggen, R., Schill, K., & Visser, J. (2010, March 15). Standardized code quality

benchmarking for improving software maintainability. Paper presented at the 4th International Workshop on Software Quality and Maintainability (SQM 2010), Madrid, Spain.

Bashir, I., & Goel, A. L. (1999). Testing object-oriented software: life cycle solutios.

New York: Springer-Verlag.

Beecham, S., Hall, T., Britton, C., Cottee, M., & Rainer, A. (2005). Using an expert panel to validate a requirements process improvement model. Journal of Systems and Software, 76(3), 251-275.

Begum, R. A., Siwar, C., Pereira, J. J., & Jaafar, A. H. (2007). Factors and values of willingness to pay for improved construction waste management – A perspective of Malaysian contractors. Waste Management, 27(12), 1902-1909.

Benamati, J., & Lederer, A. L. (2001). Rapid IT change, nine IT management challenges. INFOR 8(4), 336-358.

Bentley. (2007). IFC Position Paper. Retrieved from

http://ftp2.bentley.com/dist/collateral/whitepaper/Building_IFC_Position_Paper _whitepaper_eng.pdf

Bernama. (2012, Feb 9). Malaysia's ICT spending to touch RM24.65 Bln by year-end.

Bernama Media. Retrieved from http://my.news.yahoo.com/malaysias-ict-

(3)

Bhatt, & Grover, V. (2005). Types of information technology capabilities and their role in competitive advantage: an empirical study. Journal of Management

Information Systems, 22(2), 253-277.

Bittman, T. J. (2004). Gartner introduces the infrastructure maturity model.

Björk, B. C. (1999). Information technology in construction: domain definition and research issues. International Journal of Computer Intergrated Design and Construction, 1(1), 1-16.

Bossink, B. A. G. (2004). Managing drivers of innovation in construction networks.

Journal of Construction Engineering and Management, May/June, 337-345.

Bosworth, S., Kabay, M. E., & Whyne, E. (2009). Computer Security Handbook. New Jersey: John Wiley & Sons.

Bouchlaghem, N., Thorpe, A., & Liyanage, I. G. (1996). Virtual reality application in the UK's construction industry. Retrieved 24 February, 2011, from

http://docs.google.com/viewer?a=v&q=cache:P3411GCGroAJ:itc.fgg.uni- lj.si/bled96/papers/bouchlag.pdf+VR+in+construction+industry&hl=en&gl=my

&pid=bl&srcid=ADGEEShAd5kjjaU38RF-34mE5tF79ofDxry1bz-

GMZrqLNmU0J4pRCKVl-J5eZuIaD2i9n1v-LoXrunNs-7euFu-G-F176Bz8PtA- My-

2i9gdMEDUEna0p1dbWIa95GQIbnwlfSanhJk&sig=AHIEtbSA2jD3qu3ubb0_

MUXNidqRpIX2iQ

Brandon, P., & Betts, M. (1995). The field of integrated construction information: an editorial overview. In P. Brandon & M. Betts (Eds.), Integrated construction information (pp. xxv-xxxi). London: E&FN Spoon.

Brewer, G., Gajedran, T., McCann, J., & Chen, S. E. (2003). Creating a benchmarking service to measure ICT uptake for the Australian construction industry.

Construction Informatics Digital LIbrary.

Broadbent, M., & Weill, P. (1997). Management by maxim: how business and IT managers can create IT infrastructures. Sloan Management Review, 38(3), 77- 92.

Broadbent, M., Weill, P., & Neo, B. S. (1999). Strategic context and patterns of IT infrastructure capability. Journal of Strategic Information Systems, 8(2), 157- 187.

Broadbent, M., Weill, P., O'Brien, T., & Neo, B. S. (1996). Firm context and patterns of IT infrastructure capability. Paper presented at the 17th International

Conference on Information Systems.

Brynjolfsson, E., & Schrage, M. (2009). The new, faster face of innovation. 2011(1 March). Retrieved from http://sloanreview.mit.edu/executive-

adviser/articles/2009/3/5139/the-new-faster-face-of-innovation/

Burns, R. B. (2000). Introduction to research method (4th ed.). California: Sage Publication.

Business Monitor International. (2011a, 28 October). China Information Technology Report Q4 2011. Retrieved 10 January, 2011, from

http://www.marketresearch.com/Business-Monitor-International-v304/China- Information-Technology-Q4-6657593/

Business Monitor International. (2011b, 28 November). Malaysia Information Technology Report Q4 2011. Retrieved 10 January, 2011, from

http://www.marketresearch.com/Business-Monitor-International-v304/Malaysia- Information-Technology-Q4-6657639/

Business Monitor International. (2011c, 28 October). United States Information Technology Report Q4 2011. Retrieved 10 January, 2011, from

http://www.marketresearch.com/Business-Monitor-International-v304/United- States-Information-Technology-Q4-6657712/

(4)

Butler Group. (2006a). Achieving IT Flexibility: Moving from inhibitior to enabler of change. Technology Management and Strategy Report.

Butler Group. (2006b). Technology Management and Strategy Report (No.

RT011006AIF). United Kingdom: Butler Group: a Datamonitor company.

Byrd, T. A., Lewis, B. R., & Turner, D. E. (2004). The impact of IT personnel skills on IS infrastructure and competitive IS. Information Resources Management Journal, 17(2), 38.

Byrd, T. A., & Turner, D. E. (2000). Measuring the flexibility of information technology infrastructure: Exploratory analysis of a construct. Journal of Management Information Systems, 17(1), 167-208.

Byrd, T. A., & Turner, D. E. (2001). An exploratory examination of the relationship between flexible IT infrastructure and competitive advantage. Information &

Management, 39(1), 41-52.

Camargo, M., Bary, R., Boly, V., Rees, M., & Smitgh, R. (2011, 20-22 June). Exploring the implications and impact of smartphones on learning dynamics: The role of self-directed learning. Paper presented at the 17th International Conference on Concurrent Enterprising (ICE), Aachen.

Caralli, R. A. (2004). The critical success factors method: Establishing a foundation for enterprise security management. Technical Report. No. CMU/SEI-2004-TR- 010. Pittsburgh.

Carpenter, D. A., & Agrawal, V. K. (2007). Why, when and what to outsource. In M.

Schniederjans, A. M. Schniederjans & D. G. Schniederjans (Eds.), Outsourcing management information systems. Hershey, USA: Idea Group Pubslihing.

Carrillo, P., Ruikar, K., & Fuller, P. (2012). When will we learn? Improving lessons learned practice in construction. Internatioal Journal of Project Management, Available online 7 November 2012.

Cawford, J., Leonard, L. N. K., & Jones, K. (2011). The human resource's influence in shaping IT competence. Industrial Management & Data Systems, 111(2), 164- 183.

Chagoya, F. (2007). Asset management's need for metadata and its impact on standards for process management, file formats, and metadata sources. Journal of Digital Asset Management(3), 29-31.

Chanapos, A., Krairit, D., & Khang, D. B. (2006). Managing information technology infrastructure: a new flexibility framework. Management Research News, 29(10), 632.

Chang, S.-I., Yen, D. C., Ng, C. S.-P., & Chang, W.-T. (2012). An analysis of IT/IS outsourcing provider selection for small and medium-sized enterprises in Taiwan. Information & Management, 49(5), 199-209.

Cheng, J. C. P., & Kumar, B. (2012). Cloud Computing Support for Construction Collaboration. In C. J. Anumba & X. Vang (Eds.), Mobile and pervasive computing in construction (pp. 237-253). West Sussex, United Kingdom: John Wiley & Sons.

Chien, H.-J., & Barthorpe, S. (2010). The current state of information technology and communication technology usage by small and medium Taiwanese construction companies. ITcon, 15, 75-85.

Chin, W. C. (2011). Malaysia IT spending, 2011-2015: A view from industry and company size segmentations spending. Kuala Lumpur: International Data Corporation.

Chow, T., & Cao, D.-B. (2008). A survey study of critical success factors in agile software projects. Journal of Systems and Software, 81, 961-971.

(5)

Chung, S. H., Byrd, T. A., Lewis, B. R., & Ford, F. N. (2005). An empirical study of the relationships between IT infrastructure flexibility, mass customization, and business performance. ACM SIGMIS Database, 36(3), 26-44.

Chung, S. H., Rainer Jr, R. K., & Lewis, B. R. (2003). The impact of information technology infrastructure flexibility on strategic alignment and applications implementation. Communications of the Association for Information Systems, 11(11), 1-31.

CIDB Malaysia. (2007). Construction Industry Master Plan Malaysia 2006-2015.

Kuala Lumpur: Construction Industry Development Board.

CIDB Malaysia. (2011a). A Case Study of BIM Implementation in Malaysia.

CIDB Malaysia. (2011b). CIDB Grades. Retrieved November 22, 2012, from http://www.cidb.gov.my/cidbweb/images/pdf/announcement/sspk/6%20-

%20Jadual%20Gred%20Berdaftar%20dan%20Sekatan%20Menender.pdf Clayton, B., & Fisher, T. (2006). Assessing the impact of cultures and structures

organisational capability. Vocational Education Canberra Institute of Technology: Center Undertaking Rsearch.

Compass Intelligent. (2011, 1 February). Construction Business IT Applications Expenditure 2010-2015. Retrieved 10 January, 2011, from

https://bloombergmart.com/products/LK9K6X3PWT1D/US-Construction- Business-IT-Applications-Expenditures-2010-

2015?nuts%5B%5D=WIRE%3ACIL

Cone, E. (2008). Software integration: The next generation. Retrieved from http://www.cioinsight.com/c/a/Management/Integration-Next-Generation/

Constantinescu, R. (2007). Capability Maturity Model Integration. Journal of Applied Quantitative Methods, 2(1), 31-37.

Cooke, R. M. (1991). Experts in uncertainty: opinion and subjective probability in science. Oxford: Oxford University Press.

Cooper, J., & Fisher, M. (2002). Software Acquisition Capability Maturity Model (SA- CMM), Version 1.03. Pittsburgh: Software Engineering Institute.

Cooper, R. B., & Zmud, R. W. (1990). Information technology implementation

research: a technological diffusion approach. Management Science, 36(2), 123- 139.

Copeland, L. (2003). The Maturity Maturity Model (M3): Guidelines for improving the maturity process. Retrieved Apr, 21, 2011, from

http://www.stickyminds.com/sitewide.asp?Function=WEEKLYCOLUMN&Obj ectId=6653

Crawford, J. K. (2006). Project Management Maturity Model (Second ed.). New York:

Auerbach Publication.

Creswell, J. W. (2009). Research Design: Qualitative, Quantitative, and Mixed Methods Approaches (3rd ed.). California: Sage Publications.

Crowston, K., & Qin, J. (2011). A capability maturity model for scientific data

management: Evidence from the literature. Paper presented at the Proceedings of the American Society for Information Science and Technology.

Curtis, B., Hefley, W. E., & Miller, S. (1995). Overview of the People Capability Maturity Model. Pennsylvania: Software Engineering Institute.

Dadhich, R., & Chauhan, U. (2012). Integrating CMMI Maturity Level-3 in traditional software development process. International Journal of Software Engineering and Applications, 3(1), 17-26.

Davenport, T., & Linder, J. (1994). Information management infrastructure: the new competitive weapon? Paper presented at the Proceedings of the Twenty-Seventh Hawaii International Conference on System Sciences.

(6)

Davison, S. C., & Ward, K. (1999). Leading International Teams. Berikshire, England:

McGraw-Hill International.

Dawood, N. (2002). Development of automated communication of system for managing site information using internet technology. Automation in Construction, 11(5), 557-572.

Dawood, N., Sriprasert, E., Mallasi, Z., & Hobbs, B. (2001, 4-5 October). Development of an integrated information resource base for 4D/VR construction processes simulation. Paper presented at the AVR II and CONVR2001, Chalmers, Gothenburg, Sweeden.

De Leeuw, A. C. J., & Volberda, H. W. (1996). On the concept of flexibility: a dual control perspective. Omega, 24(2), 121-139.

Deed, C., & Cragg, P. (2012). Business Impacts of Cloud Computing. In B. A & A. K.

Aggarwal (Eds.), Cloud Computing Service and Deployment Models: Layers and Management (pp. 274-288): IGI-Global.

Dell. (2006). How Dell Does IT. Special Advertising Section Retrieved August 9, 2012, from http://www.oracle.com/us/corporate/publishing/dell-supp-example-

078455.pdf

Deraman, R., Salleh, H., Beksin, A. M., Alashwal, A. M., Abdullahi, B. C., &

Abdullah, A. A. (2011). The roles of information and communication

technology (ICT) systems in construction supply chain management and barriers to their implementation. African Journal of Business Management, 6(7), 2403- 2411.

Dobbis, J. H. (2001, September - October). Identifying and analyzing critical success factors. Program Management.

Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2011). Analysing factors affecting delays in Indian construction projects. International Journal of Project

Management, Online(25 November 2011).

Don. (2008). Assess your readiness for organizational change. Retrieved March, 16, 2012, from http://renovacorp.com/assess-your-readiness-for-organizational- change-2/

Duncan, N. B. (1995). Capturing flexibility of information technology infrastructure: A study of resource characteristics and their measure. Journal of Management Information Systems, 12, 37-58.

Earthy, J. (1998). Usability Maturity Model: Human Centredness Scale (Vol. Project IE2016): European Usability Support Centres.

Erdogan, B., Abbott, C., & Aouad, G. (2010). Construction in year 2030: developing and information technology vision. Philosophies Transactions of The Royal Society. Retrieved from

http://rsta.royalsocietypublishing.org/content/368/1924/3551.full

Evans, R. (2011, February ). Technology creates ever-changing leadership challenges.

Retrieved November 14, 2012, from http://www.cpoagenda.com/previous- articles/winter-2010-11/features/technology-creates-ever-changing-leadership- challenges/

Fan, L., Rajib, M. S. U., & Alam, M. S. (2012). Business process re-engineering in the SMEs: Critical success factors perspective of an emerging economy.

International Journal of Contemporary Business Studies, 3(110), 6-18.

Faux, J. (2010). Pre-testing survey instruments. Global Review of Accounting and Finance, 1(1), 100-111.

Field, A. (2009). Discovering statistics using SPSS (3rd ed.). London: Sage Publications Ltd.

(7)

Fink, L. (2009). Towards a Flexible Information Technology Infrastructure: A Multidimensional Analysis. Saarbrucken: VDM Verlag Dr. Muller Aktiengelsellschaft & Co. KG.

Fink, L., & Neumann, S. (2007). Gaining agility through IT personnel capabilities: The mediating role of IT infrastructure capabilities. Journal of the Association for Information Systems, 8(8), 440.

Fisher, K. (2000). Leading self-directed work teams:A guide to developing new team leadership skills. New York: McGraw-Hill.

Foon, H. W. (2012, August 15). Malaysia 2Q GDP grows 5.4%, spurred by construction. The Edge.

Ford, M. (2009). The lights in the tunnel - Automation, accelerating technology and the economy of the future. United States: Acculant Publishing.

Forrester Research. (2009, 29 June). US and global IT market outlook: Q2 2009.

Retrieved 9 November 2009, from

http://www.forrester.com/Research/Document/Excerpt/0,7211,48356,00.html Forrester Research. (2011). The Value of IT Flexibility when Change is the New

Normal - Can your Organisation Adapt to Change? Retrieved April 19, 2012, from http://media.netapp.com/documents/thought-leadership-flexible-it-

paper.pdf

Foster, J. J. (2001). Data analysis using SPSS for Windows Versions 8 -10: A beginner's guide. London: SAGE.

Francis, K., & Richardson, P. (2009). Green maturity model for virtualisation.

Retrieved 26 January 2012, from http://msdn.microsoft.com/en- us/library/dd393310.aspx

Froese, T. (1999). Interwoven threads: Trends in the use of information technologies for the construction industry, A white paper prepared for the Berkely-Stanford CE&M Workshop.

Fruchter, R., & Lewis, S. (2003). Mentoring models in support of P5BL in

Architecture/Engineering/Construction Global Teamwork. International Journal of Engineering Education, 19(5), 663-671.

Gaith, F. H., Khalim, A. R., & Ismail, A. (2012). Application and efficacy of

information technology in construction industry. Scientific Research and Essay, 7(38), 3223-3242.

Galliers, R. D. (Sutherland, A). The evolving information systems strategy -

information systems management strategy formulation: applying and extending the 'stages of growth' concept. In R. Galliers & D. Leidner (Eds.), Strategic information management - challenges and strategies in managing information systems (pp. 33-63). Oxford: Butterworth-Heinemann.

Galliers, R. D., & Leidner, D. E. (2003). Strategic Information Management - Challenges and strategis in managing information systems. Oxford:

Butterworth-Heinemann.

Ganesh, L., & Mehta, A. (2011). A survey instruent for ranking of the critical success factors for the successful ERP implementation at Indian SMEs. BIOINFO Business Economics, 1(1), 6-12.

Gann, D., & Salter, A. (2000). Innovation in Project-Based, Service-Enhanced Firms:

the construction of complex products and services. Research Policy, 29, 955- 972.

Gartner. (2004). Roadmap for you infrastructure - the Gartner Infrastructure Maturity Model.

Gartner. (2008a). Gartner says Cloud Computing will be as influential as e-business.

Retrieved from http://www.gartner.com/it/page.jsp?id=707508

(8)

Gartner. (2008b). Gartner says worldwide outsourcing market to grow 8.1 percent in 2008. Retrieved April 11, 2011, from

http://www.gartner.com/it/page.jsp?id=578307

Gartner. (2010a). Gartner's Hype Cycle Special Report for 2010. In J. Fenn, B.

Gammage & M. Raskino (Eds.): Gartner Group.

Gartner. (2010b, 18 May). IT spending to rise 4.1% in 2010, Gartner says. Retrieved 19 July, 2010, from http://www.networkworld.com/news/2010/051910-gartner- it-spending-rise.html

Gartner. (2011a). 2011 CIO Agenda Findings. Retrieved November 24, 2011, from http://www.gartner.com/technology/cio/cioagenda_findings.jsp

Gartner. (2011b). Predicts2011: Gartner's predictions for the year ahead. Retrieved 24 February, 2011, from http://www.gartner.com/technology/research/predicts/

Gartner Group. (2010, 18 May). IT spending to rise 4.1% in 2010, Gartner says.

Retrieved 19 July, 2010, from

http://www.networkworld.com/news/2010/051910-gartner-it-spending-rise.html Gates, L. P. (2010). Strategic planning with critical success factors and future

scenarios: An integrated strategic palnning framework. Hanscom AFB, MA:

Carnegie Mellon University.

Ghavifekr, S., Hussin, S., Ghani, M. F. A., & Abdullah, Z. (2012). Visonary planning for a technology-based environment - A Malaysian case study. Asian

Transactions on Engineering, 2(3), 51-61.

Gibbs, G. (2007). Analyzing qualitative data. London: The Sage Qualitative Research Kit.

Glover, W. J., Farris, J. A., Aken, E. M. V., & Doolen, T. L. (2011). Critical success factors for the sustainability of Kaizen event human resource outcomes: An empirical study. International Journal of Production Economics, 132(2), 197- 213.

Goh, G. (2012). NetApp pushes agile data infrastructure. Retrieved August 10, 2012, from

http://techcentral.my/news/story.aspx?file=/2012/7/2/it_news/20120702122724

&sec=it_news

Gray, J., Liu, D. T., Nieto-santisteban, M., Szalay, A. S., DeWitt, D., & Heber, G.

(2005). Scientific Data Management in the Coming Decade. Redmond:

Microsoft Research.

Gray, M. (2009). The NHS Infrastructure Maturity Model (NIMM).

Green, L. (2001). Technoculture. Crows Nest: Allen&Unwin.

Grigg, N., & Mann, R. (2008). An international study into creating awareness of business excellence models. The TQM Journal, 20(3), 233-248.

Gross, J. R., & Raymond, B. (1993). Total flexibility management: a managerial approach for developing flexible resources. Industrial Management 35, 21-21.

Grunert, K. G. & Ellegard, C (1992). The concept of key success factors: Theory and method. MAPP Working Paper No. 4.

Gulbert, C. (2008, June 29). CMMI for Development 1.2. Retrieved November 22, 2012, from http://chrguibert.free.fr/cmmi12/cmmi-dev/text/7938cba-5996.php Hair, Black, Babin, Anderson, & Tatham. (2006). Multivariate Data Analysis (6th ed.).

United States: Pearson Prentice Hall.

Hamel, G., & Prahalad, C. K. (1994). Competing for the future. United States: Harvard Business School Press.

Hamel, S. (2009). The Web Analythics Maturity Model: A strategic approach based on business maturity and critical success factors. Retrieved January 31, 2012, from

(9)

Han, J., & Kamber, M. (2006). Data Mining Concepts and Techniques. San Francisco:

Morgan Kaufmann Publishers.

Haris, F. (2010). IT Infrastructure Maturity Model (ITI-MM) - A roadmap to agile IT infratructure. University of Twente, Enschede.

Haynes, S. N., Richard, D. C. S., & Kubany, E. S. (1995). Content Validity in

Psychological Assessment: A Functional Approach to Concepts and Methods.

Psychological Assessment, 7(3), 238-247.

Hennig, C., Mullensiefen, D., & Bargmann, J. (2003, June). Comparison of changes in a pretest-posttest design with Likert scales. Paper presented at the Seminar f¨r Statistik Eidgen¨ssische Technische Hochschule (ETH), Zurich, Switzerland.

Hewage, K. N., Ruwanpura, J. Y., & Jergeas, G. F. (2008). IT usage in Alberta's building construction projects: Current status and challenges. Automation in Construction, 17, 940-947.

Hewlett-Packard Company. (2007). Adaptive Infrastructure Maturity Model. United States: Hewlett-Packard Development Company.

Hinssen, P. (2011). The New Normal: Explore the limits of the digital world. United States: Lannoo Publishers.

Hints, P. (2009, August, 31). Create Staffing Management Plan. Retrieved March, 15, 2012, from http://www.cmguide.org/archives/1426

Hopkinson, J. P. (1996). System Security Engineering Capability Maturity Model.

Ottawa: EWA-Canada Ltd.

Hore, A. (2006). Use of IT in managing information and data on construction projects - a perspective for the Irish construction industry. Information Technology in Construction Project Management.

Horta, I. M., Camanho, A. S., Johnes, J., & Johnes, G. (2012). Performance trends in the construction industry worldwide: an overview of the turn of the century.

Journal of Productivity Analysis Retrieved November 15, 2012, from http://repositorio-aberto.up.pt/bitstream/10216/62520/2/30770.pdf

Howes, R. (2000). Making governace mechanisms effective in a coordinated industry:

the case of construction in the United Kingdom. International Journal of Technology Management, 20(1), 194-213.

Humphrey, W. S. (1987). A method for assessing the software engineering capability of contractors. Carnegie Mellon University: Software Engineering Institute.

Hwang, H.-G., Yeh, R., Chen, H.-G., Jiang, J. J., & Klein, G. (2011). IT investment strategy and IT infrastructure services. The Review of Business Information Systems, 6(2), 55-64.

IBM. (2006). An architectural blueprint for autonomic computing (4th ed.). United States: White paper - International Business Machine (IBM).

Idrus, A. B., & Newman, J. B. (2002). Construction related factors influencing the choice of concrete floor systems. Construction Management and Economics, 20, 13-19.

Ifinedo, P., & Ifinedo, A. (2011). A snapshot of key information systems (IS) issues in Estonian organiztaions for the 2000s. Baltic Journal of Management, 6(2), 163- 178.

Jackson, S., & Philip, G. (2010). A techno-cultural emergence perspective on the management of techno-change. International Journal of Information Management, 30, 445-456.

Jafari, S. M., Yusuff, R. M., & Tang, S. H. (2006). ERP Systems Implementation in Malaysia: The Importance of Critical Success Factors. International Journal of Engineering and Technology, 3(1), 125-131.

(10)

Jaferian, P., Botta, D., Hawkey, K., & Beznosov, K. (2008, July, 23). Design guidelines for IT security management tools. Paper presented at the SOUPS Workshop on Usable IT Security Management (USM), Pittsburgh, USA.

James, H. S., & Weidenbaum, M. (1993). When business cross international borders.

Westport: Preager.

Jie, Z., Han, L., & Jennifer, L. Z. (2009). Resource or capability? A dissection of SMEs' IT infrastructure flexibility and its relationship with IT responsiveness. Journal of Computer Information Systems, Fall.

Jimeno, M., Christensen, K., & Nordman, B. (2008, 7-9 December). A network connection proxy to enable hosts to sleep and save energy. Paper presented at the International Conference of Performance, Computing, and Communications Austin, Texas.

Jochem, R, Geers, D, Heinze, P. (2011), "Maturity measurement of knowledge- intensive business processes", The TQM Journal, Vol.23 (4), pg. 377-387.

Johnson, W. J., Leach, M. P., & Liu, A. H. (1999). Theory testing using case studies in business-to-business research. Industrial Marketing Management, 28(3), 201- 213.

Jorfi, S., Nor, K. M., & Najjar, L. (2011). Assessing the impact of IT connectivity and IT capability on IT-business strategic alignment: An empirical study. Computer and Information Science, 4(3), 76-87.

Jurvetson, S. (2010). The pace of innovation never falters. Technology Review by MIT.

Retrieved from http://www.technologyreview.com/business/24562/

Kaliannan, M., Raman, M., & Dorasamy, M. (2009). ICT in the context of public sector service delivery: a Malaysian perspective. World Scientific and Engineering Academy and Society (WSEAS) Transactions on Systems, 8(4).

Kandelousi, N. S., Ooi, J., & Abdollahi, A. (2011). Key success factors for managing projects. World Academy of Science, Engineering, and Technology, 59, 1826- 1830.

Karresand, M., & Shahmehri, N. (2006). File Type Identification of Data Fragments by their Binary Structure. IEEE Information Assurance Workshop, West Point, New York(21-23 June), 140-147.

Kashorda, M. (2012, September 19). ICT innovations changing lives in Kenya. Paper presented at the 2nd OECD Global Forum on Knowlegde Economy, Seoul, South Korea.

Kennet, S. (2010, 30 April). Construction is second worst in IT. Retrieved 19 July 2010, from http://www.building.co.uk/news/construction-is-second-worst- investor-in-it/3162596.article

Kerzner, H. (2001). Strategic planning for project management using a project management maturity model. New York: John Wiley & Sons.

Khalil, M. F., Acharya, H. S., & Alam, M. (2012). Data Mining and Warehousing for Comprehensive Web Based Project Management Software. Journal of

Computing Technologies.

Khandelwal, V., & Ferguson, J. (1999). Critical Success Factors (CSFs) and the Growth of IT in Selected Geographic Regions. Paper presented at the 32nd of Hawaii International Conference on Systems Sciences (HICSS-32), Hawaii, USA.

Khosrowpour, M., Subramaniam, G. H., Gunderman, J., & Saber, A. (2011). Managing information technology with outsourcing: An assessment of employee

perceptions. Journal of Applied Business Research, 12(3), 85-96.

Kirkwood, D. A., Alinaghian, L. S., & Srai, J. S. (2011, April 29 - May 2). A Maturity

(11)

at the 22nd Annual Conference of the Production and Operations Management Society, Nevada, USA.

Klein, C., DiazGranados, D., Salas, E., Le, H., Burke, C. S., Lyons, R., et al. (2009).

Does Team Building Work? Small Group Research, 40(2), 181-222.

Koehn, D. J., & Adler, R. (2010). CALM (change, adaptin, learning model) - Dealing with change holistically and dynamically. Retrieved from

http://www.articlesbase.com/management-articles/calm-change-adaptation- learning-model-dealing-with-change-holistically-and-dynamically-2463039.html Kong, A. T., & Gray, J. (2006). Problems with traditional procurement in the

Malaysian construction industry - a survey. Paper presented at the Proceedings Australian Universities Building Educators Association Annual Conference, University of Technology, Sydney.

KPMG. (2010). Improved flexibility with XBRL. Retrieved 4 March 2010:

http://www.kpmg.com/Global/en/WhatWeDo/Special-

Interests/XBRL/Pages/Improved-flexibility-with-XBRL.aspx

KPMG IT Advisory. (2010). From cost to value: 2010 global survey on CIOs agenda:

KPMG International.

Kwak, Y. H., & Ibbs, C. W. (2002). Project Management Process Maturity (PM)2 Model. Journal of Management in Engineering, July, 150-155.

Lacerda, R. T. d. O., Ensslin, L., & Ensslin, S. R. (2011). A performance measurement view of IT project management. International Journal of Productivity and Performance Management, 60(2), 132-151.

Lacity, M., & Willcocks, L. (2012). Outsourcing business and IT services: the evidence of sucess, robust practices and contractual challenges. Legal Information

Management, 12, 2-8.

Lamb, J. (2011). Green IT and use of private cloud computing in South Africa. Paper presented at the 8th International Conference & Expo on Emerging

Technologies for a Smarter World (CEWIT), Somers, New York.

Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1997). Factor influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management and Economics, 15, 83-94.

Larsen, E. R. (2010). Making the Team: Teams, teamwork, and teambuilding.

Chemical Engineering Progress, June, 41-45.

Lautanala, M., Enkovaara, E., Heikkonen, A., & Taiponen, T. (1998). Potential benefits of information technology in construction in Finland. Exchange, 60, 80.

Leana, C. R., & Barry, B. (2000). Stability and change as simultaneous experiences in organisational life. Academy of Management Review, 25(4), 753-759.

Lee, C. K. M., Yeung, Y. C., & Hong, Z. (2011, June 27-30). Managing the risks of outsourcing in supply chain networks. Paper presented at the IEEE International Technology Management Conference (ITMC), San Jose, California.

Lee, D. M. S., Trauth, E. M., & Farwell, D. (1995). Critical skills and knowledge requirements of IS professionals: A joint academic/industry investigation. MIS quarterly, 19(3), 313.

Lee, M. (2011, November, 14). What is OpenDocument? Retrieved March, 14, 2012, from http://www.fsf.org/campaigns/opendocument

Leganza, G., Cullen, A., & An, M. (2010). The top 15 technology trends EA should watcha: 2011 to 2013. Forrester Research.

Lewin, K. (1952). Group decision and social change. In E. Newcombe & R. Harley (Eds.), Readings in Social Psychology (pp. 459-473). New York: Henry Holt.

Li, M. (2010). Applications of virtual reality technology in construction industry. Paper presented at the 2nd International Conference on Computer Engineering and Technology (ICCET) 2010.

(12)

Lian, O. S. (2012, September 25-26). Responding to Global Challenges - The Need for Professional Standards. Paper presented at the Quantity Surveying International Convention 2012, Kuala Lumpur.

Lovins, A. B. (2012). Response. In J. Wilsdon (Ed.), Digital Futures: Living in a Networked World (pp. 69-71). London, United Kingdom: Earthscan Publications Ltd.

Macmillan Dictionary. (2011). Ad hoc. Retrieved April 12, 2011, from Macmillan Publishers Limited: http://www.macmillandictionary.com/dictionary/british/ad- hoc

Macredic, & Sandom. (1999). IT-enabled change: evaluating an improvisational perspective. European Journal of Information Technology, 19(1), 4-20.

Mahmud, K. H. (2008). Outsourcing in Construction Industry: Fraser Milner Casgrain.

Maier, A.M, Moultrie, J, Clarkson, P. J. (2009). Developing maturity grids for assessing organisational capabilities: practitioner guidance. In. 4th International

COnference on Management Consulting, Academy of Management, 11-13 June, Vienna, Austria.

Manmohan. (2010). Keepmoat CIO Andrew Newton: Outsourcing is natural to construction trade. Retrieved 9 February 2011, from

http://www.theoutsourceblog.com/2010/07/keepmoat-cio-andrew-newton- outsourcing-is-natural-to-construction-trade/

Masrek, M. N. (2011). The relevancy of ITIF Maturity Model for the Construction Industry. In N. Zainon (Ed.). Kuala Lumpur.

Masrek, M. N., & Jusoff, K. (2009). The effect of information technology infrastructure flexibility on intranet effectiveness. Computer and Information Science, 2(2), 57-67.

Maxwell, J. A. (2005). Qualitative Research Design (2nd ed.). California: Sage Publication.

McAlearney, S. (2008, September, 5). Does a Tech Manage need to be Tech-Savvy.

Retrieved March 16, 2012, from

http://www.cio.com/article/447783/Does_a_Tech_Manager_Need_to_Be_Tech_

Savvy_

McGrawHill. (2009). SmartMarket Report, the business value of building information modeling: getting building information modeling to the bottom line.

Merriam-Webster. (2011). Ad-hoc. Retrieved April 12, 2011: http://www.merriam- webster.com/dictionary/ad+hoc

Metcalfe, S. (2008). Technical change. The New Palgrave Dictionary of Economics, 2nd Ed.

Mezo. (2010). Amazing technology: New amazing technologies. Retrieved 1 March, 2011, from http://hubpages.com/hub/Amazing-technology

Mika, S. (2009). The four drivers of innovation. Retrieved Mar 29, 2011:

http://gmj.gallup.com/content/26068/the-four-drivers-of-innovation.aspx Ministry of Works Malaysia. (2011). Application System Directory (Vol. 2). Kuala

Lumpur: Ministry of Works Malaysia,.

Mishra, A. N., & Agarwal, R. (2010). Technological frames, organizational capabilities, and IT use: An empirical investigation of electronic procurement. Information Systems Research, 21(2), 249-270.

Mollick, E. (2006). Establishing Moore's Law. Annals of the History of Computing, IEEE, 28(3), 62-75.

Moore, J. E., & Williams, C. K. (2012). IS Employees Attitudes and Perceptions at Varying Levels of Software Process Maturity. MIS Quarterly, 36(2),

(13)

Morgan, G. A., Leech, N. L., Gloeckner, G. W., & Barrett, K. C. (2011). IBM SPSS for introductory statistics: Use and interpretation (4th ed.). New York: Taylor &

Francis Group.

Mukelas, M. F. M., & Zawawi, E. A. (2012). Theoretical framework for ICT

implementation in the Malaysian construction industyry: Issues and challenges.

Paper presented at the International Conference on Innovation Management and Technology Research (ICIMTR).

Myers, D. (2001). Construction Economics: a new approach. New York: Spon Press.

Myers, M. D. (2008). Qualitative research in business & management. London: SAGE.

MyIPO. (2011). Intellectual Property Corporation of Malaysia: Patent Statistics.

Retrieved 1 March, 2011, from

http://www.myipo.gov.my/index.php?option=com_content&view=article&id=1 60&Itemid=327

MyIPO. (2012). Intellectual Property Corporation of Malaysia: Patent Statistics.

Retrieved August 14, 2012, from

http://www.myipo.gov.my/index.php?option=com_content&view=article&id=1 60&Itemid=327

Napshin, S. A., & DeCarolis, D. (2011). The ability to change or the willingness to change: Stakeholder interpretation of adversity. Journal of Emerging Knowledge on Emerging Markets, 3(3), 1-29.

NASCIO. (2003). Enterprise Architecture Maturity Model. Columbia: National Association of State Chief Information Officers (NASCIO).

Natovich, J. (2003). Vendor related risks in IT development: A chronology of an

outsourced project failure. Technology Analysis & Strategic Management, 15(4), 409-419.

Nelson, K. M., & Nelson, H. J. (1997, 3-6 January). Technology Flexibility:

Conceptualization, Validation, and Measurement. Paper presented at the 30th Hawaiian International Conference on System Sciences (HICSS), Maui, Hawaii.

Ness, L. R. (2005). Assessing the Relationships among IT Flexibility, Strategic Alignment, and IT Effectiveness: Study Overview and Findings. Journal of Information technology management, 16(2), 1-17.

NetApp. (2011a, September 26). 53% of IT professionals say infrastructure is not flexible. News@NetApp. Retrieved from

http://www.netapp.com/uk/company/news/news-rel-20110926-113474-uk.html NetApp. (2011b). Make your IT future ready today by building a shared IT

infrastructure. Retrieved November 24, 2011, from

http://www.netapp.com/us/company/leadership/flexible-it/feature-story-shared- it-infrastructure.html

NetApp. (2011c). Success story: Tucson Electric Power saves millions with virtualized storage from NetApp. Retrieved April 19 2012, from

http://media.netapp.com/documents/TEP.pdf

New Straits Time. (2007, December 5). Leverage on ICT in construction industry. New Straits Times.

Niazi, M., Wilson, D., & Zowghi, D. (2003). A maturity model for the implementation of software process improbement: an empirical study. Journal of Systems and Software, 74(2), 155-172.

Niederman, F., Brancheau, J. C., & Wetherbe, J. C. (1991). Information systems management issues in the 1990s. MIS Quarterly, 15(4), 474-499.

Niessink, F., Clerc, V., & Vliet, H. (2002). The IT Service Capability Maturity Model.

USA: Software Engineering Research Centre.

(14)

Nottingham, M. (2005). RSS Tutorial for Content Publishers and Webmasters.

Retrieved March, 13, 2012, from http://www.mnot.net/rss/tutorial/

Núria, F. M. (2005). Life cycle document management system for construction.

University Politechnic of Catalunya, Catalunya.

Odeh, A. M., & Battaineh, H. T. (2002). Causes of construction delay: Traditional contracts. International Journal of Project Management, 20(1), 67-73.

Office for National Statistics. (2007). UK Standard Industrial Classification of Economic Activities 2007. United Kingdom: Palgrave Macmillan.

Ogwueleka, A. (2011). The critica success factors in influencing project performance in Nigeria. International Journal of Management Studies and Engineering

Management, 6(5), 343-349.

Ojiako, G. U., Greenwood, D. J., & Johansen, D. E. (2005). Modelling new success criteris for projects in the ICT industry. Journal of ICT, 4, 17-36.

Omar, R., Ramayah, Lo, M.-C., Sang, T. Y., & Siron, R. (2010). Information sharing, information quality and usage of information technology (IT) tools in Malaysian organisations. African Journal of Business Management, 4(12), 2486-2499.

Omogbadegun, Z. O. (2010, July 13-22). ICT & Property Networking. Paper presented at the Information Communications Technology and Real Estate Property Networking Workshop, Ota, Nigeria.

Orlikowski, W. J., & Hofman, J. D. (1997). In improvisational model of change management: The case of Groupware Technologies. Sloan Managamenet Review, Winter.

Orti, P. S., Cavenaghi, V., & Albino, J. P. (2010). Sustainability and Performance Management Systems. Paper presented at the POMS 21st Annual Conference, Vancouver, Canada.

Oyewobi, L. O., & Ogunsemi, D. R. (2010). Factors influencing reworks occurence in construction: A study of selected building projects in Nigeria. Journal of Building Performance, 1(1), 1-20.

Ozer, M. (2002). The role of flexibility in online business. Business Horizons, 61-69.

Palit, M., & Stein, C. (2009). How to collaborate in a virtual world: Teaching

teamwork and technology. American Journal of Educational Studies, 2(1), 39- 50.

Paschke, J., Molla, A., & Martin, B. (2008, 3-5 December). The extent of IT-enabled organisational flexibility: an exploratory study among Australian organisations.

Paper presented at the 19th Australasian Conference on Information Systems, Christchurch.

Pataki, G. E., Dillon, J. T., & McCormack, M. (2003). The New York State Project Management Guidebook, Release 2. New York: New York State Office for Technology.

Patten, K., Whitworth, B., Fjermestad, J., & Mahinda, E. (2005, August 11th-14th).

Leading IT Flexibility: Anticipation, Agility, and Adaptability. Paper presented at the Eleventh Americas Conference on Information Systems, Omaha, NE, USA.

Paulk, M. C. (2009). A history of the Capability Maturity Model for Software. The Software Quality Profile, 12(1).

Paulk, M. C., Curtis, B., Chrissis, M. B., & Weber, C. V. (1993). Capability Maturity Model for Software, Version 1.1. Hanscom: Carnegie Mellon University.

Peansupap, V., Walker, D. H. T., Goldsmith, P. W., & Wilson, A. (2003). Developing within-company information and communication technologies (ICT) innovation diffusion networks: a study of three Australian major contractors. Paper

(15)

Peline, M., Mines, C., & Musto, S. (2011). The rise of wannabe and maverick mobile workers. Forrester Research, February 16.

Pöppelbuß, J., & Röglinger, M. (2011, June 9-11). What makes a useful maturity model? A framework of general design principles for maturity models and its demonstration in business process management. Paper presented at the Proceedings on European Conference on Information Systems, Helsinki, Finland.

Ply, J.K, Moore, J.E, Williams, C.K, & Thatcher, J.B. (2012). IS employee attitudes and perceptions at varying levels of software process maturity. MIS Quarterly, Vol.36(2).

Pratt, M. K. (2009, May 18). Keeping pace with evolving technologies. Retrieved Sept 27, 2009, from

http://www.cio.com/article/492866/Keeping_Pace_with_Evolving_Technologie s?page=2&taxonomyId=3166

Pugsley, A. (2008, 1 March). Assessing your SOA Program. Hewlett-Packard Development Company Retrieved March 21, 2012, from

http://h20195.www2.hp.com/v2/GetPDF.aspx/4AA0-4824ENW.pdf

Rainer, A., & Hall, T. (2002). Key success factors for implementing software process improvement: a maturity-based analysis. Journal of Systems and Software, 62(2), 71-84.

Raskino, M. (2010). Google Wave is following the Gartner Hype Cycle. Retrieved Mar 28, 2011, from Harvard Business Press:

Rivard, H. (2000). A Survey on the Impact of Information Technology in the Canadian Architecture, Engineering and Construction Industry. ITcon, 5, 37-56.

Roberts, R., & Stephenson, T. (2008). Managing IT to support rapid growth: An interview with the CIO of NetApp. The McKinsey Quarterly, June.

Robertson, K. (2012). Project Management Maturity Model. Retrieved March 21, 2012, from http://www.klr.com/white_papers/pdfs/pm_maturity_model.pdf Rogers, E. M. (2005). Diffusion of Innovations (5th Edition ed.). New York: Free Press.

Rong, G., & Grover, V. (2009). Keeping up-to-date with information technology:

Testing a model of technological knowledge renewal effectiveness for IT professionals. Information & Management, 46(7), 376-387.

Ruddock, L. (2006). ICT in the construction sector: computing the economic benefits.

International Journal of Strategic Property Management.

Runeson, P., & Host, M. (2009). Guidelines for conducting and reporting case study research in software engineering. Empirical Software Engineering, 14, 131-164.

Sääksjärvi, M. (2000). The Roles of Corporate IT infrastructure and their impact on IS effectiveness. Paper presented at the Proceedings of the 8th European

Conference on Information Systems, Vienna, Austria.

Saleh, Y., & Alshawi, M. (2005). An alternative model for measuring the success of IS projects: the GPIS model. Journal of Enterprise Information Management, 18(1), 47-63.

Salin, A. S. A. P., & Abidin, Z. z. (2011). Information and communication technologies (ICT)s and a Smart City in Malaysia. Paper presented at the 2010 International Conference on Business and Economics Research, Kuala Lumpur, Malaysia.

Salleh, H. (2007). Measuring Organisational Readiness Prior to IT/IS Investment.

University of Salford, Salford.

Salman, A. (2009). ICT, the new media (internet) and development: Malaysian experience. The Innovation Journal: The Public Sector Innovation Journal, 15(1), Article 5.

Samah, B. A., Shaffril, H. A. M., D'Silva, J. L., & Hassan, M. A. (2010). Information communication technology, village development and security committee and

(16)

village vision movement: a recipe for rural success in Malaysia. Asian Social Science, 6(4), 136-144.

SAP. (2009). Strategic information technology: maximize success by closing the gap between strategy and execution. Retrieved 7 December, 2009, from

http://www.sap.com/asia/solutions/executiveview/it/index.epx

Sarshar, M., Finnemore, M., Haigh, R., & Goulding, J. (1999). SPICE: Is a Capability Maturity Model applicable in the construction industry? In M. A. Lacasse & D.

J. Vanier (Eds.), Durability of Building Materials and Components. Ottawa, Canada: Institute for Research in Construction.

Sattineni, A. (2008). Outsourcing and off-shoring: Options for the US construction industry. International Business & Economics Research Journal, 7(5), 59-66.

Sauer, C., & Reich, B. H. (2009). Rethinking IT project management: Evidence of a new mindset and its implications. International Journal of Project Management, 27, 182-193.

Schilling, M. A. (2000). Toward a general modular systems theory and its application to interfirm product modularity. Academy of Management, 25(2), 312-334.

Schniederjans, M. J., Schniederjans, A. M., & Schnierderjans, D. G. (2005).

Outsourcing and insourcing in an international contect. Armonk, New York: M.

E. Sharpe.

Schwab, K. (2011, September 7). Country Highlights of teh Global Competitiveness Report 2011-2012. Paper presented at the World Economic Forum, Geneva, Switzerland.

Scott, S. G., & Einstein, W. O. (2001). Strategic performance appraisal in team-based organizations: One size does not fit all. Academy of Management Executive, 15(2), 107-116.

Shaharudin, M. W., Ibrahim, I. F. C., & Ismail, N. A. (2010). ICT Usage in Malaysia Construction Market. Universiti Teknologi Mara, Shah Alam.

Shakantu, W., Zulu, S., & Matipa, W. (2002). Global drivers of change: Their

implications for the Zambian construction industry. Paper presented at the CIB W107 1st International Conference: Creating a sustainable construction industry in developing countries, Stellenbosh, South Africa.

Shannon, R. (2010, April 3). What is HTML? Retrieved March, 14, 2012, from http://www.yourhtmlsource.com/starthere/whatishtml.html

Shrum, S. (1999). Continuous and staged, a choice of CMMI representations.

Retrieved August 13, 2012, from

http://www.sei.cmu.edu/library/abstracts/news-at-sei/spotlightdec99.cfm Smith, I. (2005). Achieving readiness for organizational change. Library Management,

26(6/7), 408-412.

Software Engineering Institute. (2012). Published Appraisal Results (Online Database).

from Carnegie Mellon: http://sas.sei.cmu.edu/pars/pars.aspx

Soliman, K. S., & Chen, L. D. (2003). APS: Do they work? Information Systems Management, 20(4), 50-58.

Sowden, R. (2006). P3M3 Maturity Models. Buckinghamshire: The APM Group Limited.

Soydan, G. H., & Kokar, M. M. (2012). A partial formalization of the CMMI-DEV - A Capability Maturity Model for development. Journal of Software Engineering and Applications, 5, 777-788.

Sriprasert, E., & Dawood, N. (2002, 12-14 June). Requirements identification for 4D constraint-based construction planning and control system. Paper presented at the International Council for Research and Innovation in Building and

(17)

Stanford University. (1995). New information technology slowly transforming construction industry. Stanford University Retrieved from

http://news.stanford.edu/pr/95/950829Arc5107.html

Stefanovic, I., Prokic, S., & Vukosavljevic, D. (2011). The response to the changing landscape of tomorrow: Reconfigurable organizations. African Journal of Business Management, 5(35), 13344-13351.

Stewart, R. A. (2003). Lifecycle Management of Information Technology (IT) in Construction. Griffith University.

Strohmaier, M. & Lindstaedt, S. N. (2005) . Beyond flexible information systems:

Why business agility matters. In Sixth Workshop on Business Process Modeling, Development and Support during CAiSE 2005.

Stuart, I., McCutcheon, D., Handfield, R., McLachlin, R., & Samson, D. (2002).

Effective case research in operations management: a process perspective.

Journal of Operations Management, 20(5), 419-433.

Sweeny, P. (1995). Flexibility Key to Success When Outsourcing Information Technology. Retrieved from http://www.pur.com/pubs/1101.cfm

Syuhaida, I., & Aminah, M. Y. (2007, August 28-29). Developing the deliberative key performance indicators (KPIs) in assessing the performance of public

infrastructure provision via private finance initiative (PFI) in Malaysia. Paper presented at the MICRA 2007 6th Conference and Annual Meeting, Shah Alam, Malaysia.

Syuhaida, I., & Aminah, M. Y. (2009). Benchmarking the performance of Malaysia's construction industry. Management Research and Practice, 1(1), 1-13.

Tallon, P. P., & Kraemer, K. L. (2003). Using flexibility to enhance the alignment between information systems and business strategy: Implications for IT business value. Center for Research on Information Technology and Organizations (CRITO), University of California, Irvine. Retrieved March, 12, 2004.

Takim, R., & Adnan, H. (2008). Analysis of effectiveness measures of construction project success in Malaysia. Asian Social Science, 4(7), 74-91.

Tam, C. M. (1999). Use of the internet to enhance construction communication: Total Information Transfer System. International Journal of Project Management, 17(2), 107-111.

Tanyer, A. M. (2004, 18-21 February). Developing evaluation criteria for computer integrated construction: a usability analysis with end users. Paper presented at the The World IT Conference for Design and Construction (INCITE),

Langkawi, Malaysia.

Tapia, Daneva, M., & Eck, P. v. (2007). Developing an Inter-Enterprise Alignment Maturity Model: Research Challenges and Solutions. The Netherlands:

University of Twete.

Tapia, R. S. (2007). Developing a Maturity Model for IT Alignment in a Cross- Organizational Environment. Paper presented at the Second Dutch/Begian Conference on Enterprise Information Systems (EIS), Groningen.

Tapscott, D., & Caston, A. (1993). Paradigm shift: the new promise of information technology. New York: McGraw-Hill.

Tate, J., Lucchese, F., & Moore, R. (2006). Introduction to Storage Area Networks (Fourth ed.). United States: International Business Machines Corporation.

Teng, K.-Y., Thekdi, S. A., & Lambert, J. H. (2012). Risk and safety Program

Performance Evaluation and Business Process Modeling. IEEE Transactions on Systems, Man and Cybernetics, 43(6), 1504-1513.

Tenth Malaysia Plan 2011-2015. (2010). Tenth Malaysia Plan. Retrieved April 18, 2012

(18)

The Choice. (2012, September 28). Construction Industry Plays Major Role in Spurring Economic Development. TheChoice. Retrieved from

http://www.thechoice.my/featured-articles/59832-construction-industry-plays- major-role-in-spurring-economic-development

Turner, D. E., & Lankford, W. M. (2005). Information Technology Infrastructure Flexibility: A Historical Perspective of Flexibility. Journal of Information Technology Management, XVI(2), 37-47.

UK Contractors Group. (2009). Construction in the UK Economy: The Benefits of Investment. London: L.E.K Consulting.

UK Trade & Investment. (2012, October 30). The UK ICT Market. Retrieved November 13, 2012, from

http://www.ukti.gov.uk/investintheuk/sectoropportunities/ict.html

Underwood, J., & Khosrowshahi, F. (2012). ICT Expenditure and Trends in the UK Construction Industry in Facing the Challenges of the Global Economic Crisis.

ITcon, 17, 26-42.

US Department of Commerce. (2003). Introduction - IT Architecture Capability Maturity Model. Retrieved November 11, 2011, from

http://ocio.os.doc.gov/groups/public/@doc/@os/@ocio/@oitpp/documents/cont ent/prod01_002340.pdf

Veryard, R. (2011). Technology change management. Retrieved Mar 29, 2011, from http://www.linkedin.com/in/richardveryard

Voordijk, H., Meijboom, B., & Haan, J. d. (2006). Modularity in supply chains: a multiple case study in the construction industry. International Journal of Operations & Production Management, 26(2), 600-618.

Wadhwa, S., & Rao, K. S. (2002). Framework for a Flexibility Maturity Model. Global Journal of Flexible Systems Management(Apr-Sep).

Walling, D. R. (2012). The tech-savvy triangle. TechTrends, 56(4), 42-46.

Walsh, N. (1998). A technical introduction to XML. Retrieved March, 14, 2012, from http://www.xml.com/pub/a/98/10/guide0.html

Wangwe, S. M. (1995). New technologies and the implications of changing technological conditions Exporting Africa: Technology, trade and industrialization in Sub-Saharan Africa. London: Routledge.

Warrilow, S. (2009). Project Management Maturity Model: What is it? Does it matter?

Why bother? Retrieved 16 February, 2012, from

http://www.projectsmart.co.uk/project-management-maturity-model.html Weill, P., & Olson, M. H. (1989). An assessment of the contingency theory of

management information systems. Journal of Management Information Systems, 6(1).

White, C. (2012, March 11). Survey: Telcommuting becoming more prevalent [infographoc]. Retrieved 2012, October 18, from

http://mashable.com/2012/03/11/telecommuting-infographic/

Whitworth, B., & Zaic, M. (2003). The WOSP model: Balanced information system design and evaluation. Communications of the ACM, 12, 258-282.

Willcocks, L., Venters, W., & Whitley, E. (2012). Cloud and future of business: From costs to innovation. London: Accenture.

Windows. (2005, January 21). Network connection types. Retrieved March 21, 2012, from http://technet.microsoft.com/en-us/library/cc780142(v=ws.10).aspx WIPO. (2011). World Intellectual Property Organisation. Intellectual Property - some

basic definitions Retrieved 1 March, 2011, from http://www.wipo.int/about- ip/en/studies/publications/ip_definitions.htm

(19)

Xu, X., & Liu, Q. (2011). Creation and integration mechanism of instrumentation flexible developing system. Frontiers of Mechanical Engineering, 6(2), 235- 240.

Xu, T, Tiong, R.L.K, Chew, D.A.S, & Smith, N.J. (2005), "Development Model for Competitive Construction Industry in the People's Republic of China", Journal of Construction Engineering and Management, 131, pg. 844-853.

Yang, J., Shen, P. Q., Bourne, L., Ho, C., & Xue, X. (2011). A typology for operational approaches for stakeholder analysis ang engagement: Findings from Hong kong and Australia. Constructon Management and Economics, 29(2), 145-162.

Yang, J. B., & Rei, W. P. (2010). Causes of Delay in the Planning and Design Phases for Construction Projects. Journal of Architectural Engineering, June, 80-83.

Yin, R. K. (2009). Case study research: design and methods (4th ed.). California: Sage Publications.

Yusuf, Owoyale, Keftin, & Dzasu. (2011). Analysis of factors responsible of low

utilisation of mechanical plants and equipment by indigenous construction firms.

Journal of the Environment, 6(1).

Zaino, J. (2007, October 25). IT Flexibility Key to Alignment with Business Goals.

InformationWeek. Retrieved from

http://www.informationweek.com/news/202601622

Zainon, N., Rahim, F.-A., & Salleh, H. (2011). The information technology application change trend: Its implications for the construction industry. Journal of

Surveying, Construction & Property (JSCP)(Special Issue), 6-20.

Zainon, N., Salleh, H., & Rahim, F.-A. (2011). Coping with the Rapidity of Information Technology Changes - A Comparison Review on Current Practices. World Academy of Science, Engineering, and Technology, 80, 427-433.

Zhang, S., Teizer, J., Lee, J.-K., Eastman, C. M., & Venugopal, M. (2012). Building Information Modeling (BIM) and Safety: Automatic Safety Checking of Construction Models and Schedules. Automation in Construction, 29(January), 183-195.

Zhang, Z., Cui, Y., Zhang, P., Luo, X., Xu, X., & Jin, Y. (2011, December 5-7). High flexibility XML-based configuration system of fibre channel avionics

environment. Paper presented at the 10th International Conference on Optical Communications and Networks, Guangzhou, China.

Zikmund, W. G. (2003). Business research method (7th ed.). Ohio: Thomson/South- Western.

Rujukan

DOKUMEN BERKAITAN

Reduced NPP, C inputs and above ground carbon storage Reduced soil carbon decomposition and GHG fluxes Increased soil carbon losses via wind erosion Improved water availability

Development planning in Malaysia has been largely sector-based A large number of Federal, State and local agencies are involve in planning, development and

Exclusive QS survey data reveals how prospective international students and higher education institutions are responding to this global health

In this research, the researchers will examine the relationship between the fluctuation of housing price in the United States and the macroeconomic variables, which are

There were three domains in the questionnaire; knowledge, attitudes and practices and skills (30 questions for each domain).There were three options for the administration

Organizational factors for successful implementation of information systems: disentanging the effect of top management support and training Paper presented at The

As past studies examining the effects of voluntariness of joining non- standard work arrangements towards employees’ work related attitudes were evolved into

Its meaning has been broadly applied to indicate the quality and quantity of IT technical and human resources within and across the organization (Cawford, Leonard, & Jones,