• Tiada Hasil Ditemukan

Invitation to Register Interest for the Provision of Public Cellular Service

N/A
N/A
Protected

Academic year: 2022

Share "Invitation to Register Interest for the Provision of Public Cellular Service "

Copied!
39
0
0

Tekspenuh

(1)

Invitation to Register Interest for the Provision of Public Cellular Service

Time 3 Extension – Phase 2

Ref: MCMC/RDD/PDD(5)/T3_Extn(P2)/TCA/12/14(13)

Briefing to Licensees

8 December 2014

(2)

USP Mechanism

Identify &

Notification of USP Target Areas

& Groups

• Type of services, timeline, etc.

• [R.4 USP Regulations]

Registration of Interest & USP Draft Plan

Submission

• Evaluation of USP Draft Plans from Licensees

• [R.5 & R6 USP Regulations]

Award the

Universal Service Provider(s)

• Approval of USP Draft Plans by MCMC and appointment of the Universal Service Providers for implementation

• [R.8 &9 USP Regulations]

Implementation

& Monitoring

• Implementation of Universal Service Plan

• [R.11-18 USP Regulations]

(3)

Table Of Content

3

• Introduction Section I

• Invitation to Register Interest Section II

• Payment from the USP Fund Section III

• General Terms & Conditions Section IV

• Coordination of Part 1 and Part 2 Section V

• Natural Disaster Section IV

• Appendix 1-9

Appendices

(4)

Section I Introduction

 The Provision of Time 3 Extension (T3E) for the Public Cellular Services.

 Invitation is made pursuant to USP Regulations:

• Objectives USP:

• Installation of network facilities and provision of network services

• Collective access to basic telephony and internet access services

Regulation 3(1)

• Upon the publication of the notification, the

Commission may invite all licensees to register their interest to be a universal service provider in a

particular universal service target

Regulation 5(1)

Page (6)

(5)

5

Section II

The facilities and services to be provided

Page (7)

Part 1

Installation of tower and infrastructure

- Light Duty Tower 76m

Part 2

Installation of equipment and electronics related to public cellular service under the concept of Radio Access Network (RAN) Sharing Technology for Hub and spoke.

Time 3 Extension (Phase 2 )

Hub and Spoke Concept - Light Duty Monopole 24m

(6)

Scope of Work (Part 1)

Installation of tower and monopole

NO. CAT ITEM

1

A

Self Supporting Tower / Monopole

2 Fall Arrest System

3 Aviation Light

4 Lightning Protection System

5 Anti Climb System

6 Tower Vertical Cable Gantry 7 Tower Structure Foundation 8 Concrete Plinth for Cabin /

Outdoor BTS and Genset System

9 Basic Grounding and Earthing Systems

Page (7)

Plinth

Fencing & Gate

Tower Monopole

(7)

7

No Items

1 Base Transceiver Station (BTS) equipment 2 Backhaul via microwave, VSAT or fiber 3 Antenna and Feeder System

4 Antenna Support System 5 AC Power Supply/ genset 6 Feeder Pillar with Meter Panel

7 AC Main Distribution Board Systems – outdoor or indoor type

8 DC power system including back up batteries

9 Outdoor cabinet or Cabin (collective site) complete with accessories

10 Alarm monitoring system, Horizontal Cable Gantry

11

Any necessary upgrades or additional equipment as required in the core network inclusive of calamities situation like flooding and etc.

Scope of Work (Part 2)

Installation of network facilities and network services

6&7

10 2

10 1

8

5 3&4

2

Page (7)

9

(8)

Scope Of Work Part 2 : RAN Sharing Page (8-9)

Provision of minimum 2G voice and data

at minimum speed of 3G services for 3

years

Microwave, leased line (LOS) and availability of wired

infrastructure

capable to cater the usage of minimum 3 Public Cellular Network Providers in

supporting voice and data services

Sharing RAN

BSC, RNC, the associated BTS, links, NOC and associated ancillaries facilities with full

connectivity to the MSC

Access Obligation

Testing procedure:

•Connectivity Test;

(9)

9

Scope Of Work Part 2: RAN Sharing

(interconnect and interoperability) Page (10)

Interconnect &

Interoperability

• 1.Site Location for BSC and RNC;

• 2.transmission modes to the MSC, BSC and RNC;

• 3.design of interconnectivity from RAN Sharing BSC and RNC to MSC Public Cellular Network Providers’ Core Network;

• 4.Bandwidth Dimensioning from BTS and Node-B to the BSC and RNC;

• 5.Network Block Diagram (RAN Sharing System)

• 6.Network Topology from RAN Sharing BTS and node B to BSC and RNC and from BSC and RNC to Public Cellular Network Providers’ Core Network

• 7.Network Equipment

• 8.Implementation timeline

(10)

Sample of Network Topology

Telco B BSC/ RNC

Telco C BSC/ RNC

Telco A BSC/RNC

(11)

11

Green Technology

To facilitate the growth of the green

technology industry;

To reduce the energy usage rate;

To increase national capability and

capacity for innovation in green

technology development ; and

To ensure sustainable development and

conserve the environment for future generations

Page (12)

Objectives to include the use of the green technology:

(12)

Assignment of Local Contractor

To stimulate the growth of local industries through the maximum utilization of local

materials and resources;

To encourage and support the involvement of

Bumiputera entrepreneurs;

Assignment Of Local Contractor Page (13)

(13)

Part 1:

NFP (I)

• Towers, poles, ducts and pits used in conjunction with other network facilities,

Part 2:

NFP (I)

-Radiocommunications transmitters and links;

-Shall be within “Malaysia”

-no last mile limitation specified in licence.

NSP (I)

-shall be within “Malaysia”

Other Requirement at least 1 year experience

and with good track records and/or engage in a

Collaboration or MOU with other qualified contractors or Public Cellular Network Provider

with such experience;

No outstanding amount as of 16 February 2015 :

USP Fund contribution; and License Fees (under CMA license).

AA Fees / Any other amount due to MCMC

13

ROI Requirements

Page (13-14)

License Requirement.

Reminder: Licensee are strictly to comply with their scope of licence. Any activities that breach licence condition are subject to enforcement action

(14)

Bid For : 1 cluster;

≥ 2 clusters; or

All Clusters

Registration Of Interest

Part 1

Part 2

Part 1

&2

Interested Licensees may register their interest for:

Or Or

Page (14)

(15)

15

Submission of Draft Universal Service Plan

Technical Proposal ( 1 Original & 2 Copies) (Refer template 13.2

& Appendix 5)

Financial Proposal (1 Original & 2 Copies) (Refer template 13.2

& Appendix 6)

One Off Document

(Appendix 4)

licensee’s information and other supporting

documents;

Company profile;

Letter of collaboration /

MOU; and A complete set of

softcopy of the submission

To complete

Acknowledgement form at the counter provided.

Page (15-16)

The submission of draft universal service plan shall consists :

13.6(d)…shall not bear Licensee’ name, logo or stamp

(16)

Scope of The Universal Service Plan

Coverage objective For Hub

and spoke (Appendix 1);

Description of infrastructure

and/or equipment (Appendix 2 & 9);

Capital cost – include cost breakdown, complete

computation and net figure

(NO conditional discount & option)

•BoQ template (Appendix 7)

Implementation timeline - breakdown into

activities;

Arrangement of sharing with other licensees

(if any);

Operation &

Maintenance Support Plan

template (Appendix 8);

Project Management

Team information;

Page (17-21)

(17)

17

Registration of Interest (ROI)

• 9.00am – 5.00pm ,

• 15 December 2014

Submission of Draft Universal Service Plan (monitor by CCTV)

• Before 12.00pm,

• 16 February 2015

Page (22)

Closing Date

• Reg. 6 (1) – any licencees who have registered their interest with the Commission pursuant to the invitation under Reg (5) shall submit their draft plan…;

• Fails to comply with Reg. 6(1) or 7(2) - maximum fine of RM300,000.00 or

imprisonment for a maximum term of 3 years or both

(18)

Matters to Consider For Approving

Draft USP Plan Page (22)

• Covers matters requested

• Efficient economically practicable

• Timeline

• Such other matter

Matters to Consider For Approving

Draft USP Plan (Reg. 7)

• financial capacity and capability to implement

• track record and relevant experience related to public cellular projects including work performance in previous USP project

Additional matters to be

considered

(19)

19

TYPES OF

CLAIMS USP REGS. REMARKS

i) Advance Claims (Optional)

Regulation 12 Payable in installments Initial / Preliminary installment upon receiving LOA & Progress

installments ii) Quarterly

Claims (Optional)

Regulation 20A Payable for each Quarter Expenditure i.e. Quarter ending

March, June, Sept & Dec iii) Yearly Claims

(Mandatory)

Regulation 19 (2) and 20

Net Claims Payable = Avoidable Cost

less

Any payments made in (Advance & Quarterly Claims) and Revenue forgone

Section III

Payment from the USP Fund Page (23-24)

(20)

• MCMC reserves the right to accept or reject any draft USP Plan

• to annul the tender process

• Reject all draft universal service plan

Right To Accept Any Draft

Universal Service Plan And To Reject Any Or All (Reg. 8)

• May Designates a Licensee as a Universal Service Provider offering the the best value for money

Award of The Approved Universal Service Plan (Reg. 9)

• may propose a change of site location

• Inform MCMC

• Within same UST

• The selection of site locations shall be based on 2G and 3G network

Implementation of Approved Universal Service Plan

(Reg.11)

Section IV

General Terms & Conditions

Page (25-27)

(21)

21

• comply with the standard as provided in any mandatory standards or consumer codes registered under the Act

Quality of Service and Rate

• Part 1 & part 2

Additional Services

Section IV

General Terms & Conditions

Part 1 Part 2

-Responsible for facilities in Category A and Category B as stipulated in Appendix 2 and shall be valid within the warranty period

-provide maintenance and operation support services for both PART 1 (Category B) and PART 2 work as stipulated in Appendix 2

-install and maintain equipment's for the provision of services, cabin, power supply and accessories;

-ensure the availability of service for 24 hours a day, 7 days a week

Page (26-28)

(22)

• comply with the Standard Radio System Plan (SRSP) and any other relevant standards as and when required by MCMC.

Technical Compliance

• responsible to obtain the necessary approvals from the state authority, local authority, electrical authority or other relevant authority

Authority Approval

• indemnify and keep indemnified, protect and defend at its own cost and expense, MCMC and its authorized officers

Safety

• Part 1 – 5 months

• Part 2 – 2 months (from the date of the completion of Part 1)

Implementation Timeline

Section IV

cont……General Terms & Conditions Page (28-29)

(23)

23

Page (30)

Section IV

cont……General Terms & Conditions

• the designated universal provider shall pay MCMC liquidated damages at the rate of 5% per week, for a maximum of 2 weeks, of the value of the total cost and expenses of the approved

universal service draft plan(s).

Liquidated Damages

• Part 1 shall be responsible to provide warranty for the items as stipulated in Appendix 2 as follows:

• Category A for a period of warranty by tower manufacturer; and

• Category B for a period of 12 month

Warranty Period (from the date of completion work)

• This performance bond is equivalent in value of 10% of the approved universal service plan(s)

shall be kept valid for a period of 12 months from the date of completion of the work.

Performance Bond

(24)

• An event beyond the control for the delay of Implementation

• War, Revolution , natural catastrophe etc (As per Item 33)

Effect Of Force Majeure

• High quality and free from factory defect Quality Of Materials And

Equipments

• The Designated Service Providers shall be solely responsible for all such omission/errors without any additional cost chargeable to MCMC

Omission or Errors

• Shall be genuine and newly manufactured Condition of Equipment

Page (31-32)

Section IV

cont……General Terms & Conditions

(25)

25

• Technical and Commercial Audit Inspection and Audit

• Shall submit progress report from time to time or upon request by MCMC

Monitoring and Reporting Requirement

• Shall be signed by the CEO of the Interested Licensees or any other person authorized by the Company.

Declaration

• MCMC reserves the right to issue written clarification on the specifications to formalize its requirements more precisely.

• Enquiries direct to Secretary of the Tender Committee ( tender@cmc.gov.my) / 03-8688 8000

Clarifications and Enquiries

Page (32-33)

Section IV

cont……General Terms & Conditions

(26)

 Part 1 and Part 2 service providers shall cooperate at all times to ensure:

Facilities installed can enable the provision of network services

Entire scope of work is completed within the implementation period

Section V

Coordination of Part 1 and Part 2

-

T

o consult the Part 2 on all relevant matters before commencing

-

T

o promptly notify Part 2 when the tower is ready to allow Part 2 to start their scope of works and subsequently handover to Part 2 -

T

o assist Part 2 to the

commencement of any physical

-

T

o assist Part 1 service providers in relevant matter (ie. suitability of sites etc)

-

S

hall promptly attend to issues related to its equipment as and when notified by Part 1

Page (34-35)

Part 1 Part 2

(27)

27

• Part 1 to perform any work deemed necessary to improve resilience and to protect the infrastructure following the natural disaster such as

flood, erosion due to the climate and others

• shall establish a contingency plan as stated in Item 13.1 (c) (iv) i.e. to install and maintain the equipment during normal condition and also flood disaster period.

To ensure the public cellular services is still IN-SERVICE

Section VI

Natural Disasters Continuation Of Services

Page (36)

(28)

List of Appendices Page (2-3)

• List of Universal Service Targets

Appendix 1

• Scope of Work

Appendix 2

• Registration of Interest Form

Appendix 3

• Summary of Licensee Information

Appendix 4

• Template for Summary of Technical Proposal

Appendix 5

• Template for Summary of Financial Proposal

Appendix 6

• Template for Details of Financial Proposal

Appendix 7

(29)

THANK YOU

(30)

Appendix 1

(31)

31

Appendix 2

Return

(32)

Appendix 3

(33)

33

Appendix 4

Return Enclosed:

Certified true copy financial statement and audited account by company secretary

Company incorporated less than 2 years only required to

submit 1 year financial

statement and audited account

(34)

Appendix 5

(35)

35

Appendix 6 A & 6B

Return Signature of CFO /

Any authorized Board of member &

Company Stamp Are required

The template provided should be

followed

(36)

Appendix 7

(37)

37

Appendix 8

Return

(38)

Appendix 9

(39)

Acknowledge Form

Return :pg 15

Rujukan

DOKUMEN BERKAITAN

On the auto-absorption requirement, the Commission will revise the proposed Mandatory Standard to include the requirement for the MVN service providers to inform and

services using the relevant band(s) of public cellular service network providers in Malaysia, with the capability of providing voice and data services at an

7.17 Licensees are hereby reminded that in the event that MCMC approves the draft universal service plans submitted by the Licensees under this Invitation and

Any terms or words used in this Invitation shall, unless expressly stated or if the context otherwise requires, have the same meaning as provided in the Communications and

8.4.4 Three (3) months after the receipt of the Notice of Service Termination from the MVN service provider, the Host Operator shall ensure that the unutilised

DESCRIPTION Invitation to Register Interest as Universal Service Provider for the Provision of Public Cellular Service under TIME 3 Extension. DATE 9

3.3.1.4 The actual utilisation according to spectrum sharing arrangements between the operators is shown in Table 3.8. 3.3.1.6 The 3GPP Band 7 is seen as an important band to

The Commission is hereby holding a Public Inquiry on the proposal for the revision of Mandatory Standards for Quality of Service (Public Cellular Service Network Performance)