REPORT ON THE

PERFORMANCE OF THE ELECTRICITY SUPPLY SERVICES IN MALAYSIA

YEAR 2005 EDITION

www.st.gov.my

YEAR 2005 EDREPORT ONTHE PERFORMANCE OFTHE ELECTRICITY SUPPLY SERVICES IN MALAYSIA

Suruhanjaya Tenaga (Energy Commission) 13th Floor, Menara TH Perdana 1001 Jalan Sultan Ismail 50250 Kuala Lumpur, Malaysia Tel : 603-2612 5400 Fax : 603-2693 7791 Email : info@st.gov.my

REPORT ON THE

PERFORMANCE OF THE ELECTRICITY SUPPLY SERVICES IN MALAYSIA

YEAR 2005 EDITION

www.st.gov.my

YEAR 2005 EDREPORT ONTHE PERFORMANCE OFTHE ELECTRICITY SUPPLY SERVICES IN MALAYSIA

Suruhanjaya Tenaga (Energy Commission) 13th Floor, Menara TH Perdana 1001 Jalan Sultan Ismail 50250 Kuala Lumpur, Malaysia Tel : 603-2612 5400 Fax : 603-2693 7791 Email : info@st.gov.my

(2)

REPORT ON THE PERFORMANCE

Of The Electricity Supply Services In Malaysia

YEAR 2005

EDITION

Published by:

(3)

1.0 Introduction

This report contains a brief statistical information on the performance of the electricity supply services in Malaysia for the year 2004. It provides information and statistics on the performance of the services provided by the main utilities i.e. Tenaga Nasional Berhad (TNB) in Peninsular Malaysia, Sabah Electricity Sdn. Bhd. (SESB) in Sabah, Sarawak Electricity Supply Corporation (SESCO) in Sarawak and NUR Distribution Sdn. Bhd. in Kulim Hi-Tech Park, Kulim Kedah. The information in this report includes:-

• Installed generation capacity and maximum demand of the grid;

• sales of electricity;

• reliability of the transmission system and distribution system;

• number and causes of supply interruptions;

• performance indices of electricity supply such as SAIDI, SAIFI dan CAIDI;

• statistics of voltage excursion incidents;

• performance of customer services and

• prices of electricity in Malaysia in comparison with other countries.

A massive tsunami in the Indian Ocean hit some countries in South Asia and South East Asia on 26 December and caused serious destruction to the coastal areas of these countries.

However the power stations along the coastline of Peninsular Malaysia were not hit by the tsunami and hence the security of the grid system was not affected.

A. INTRODUCTION

Prepared by :

Electricity Supply Department Energy Commission

Published by:

Energy Commission

13th Floor, Menara TH Perdana, 1001 Jalan Sultan Ismail, 50250 Kuala Lumpur, Malaysia Tel : 603-2612 5400 Fax : 603-2693 7791 Email : info@st.gov.my Url : www.st.gov.my

(4)

The information and statistics in this report are extracted from :-

• monthly reports submitted by the electricity supply utilities;

• monthly reports submitted by the distribution licensees;

• monthly reports submitted by the Grid System Operator of Peninsular Malaysia;

• monthly reports submitted by the power producers such as independent power producers, co-generators and self-generators;

• complaints received by the Energy Commission;

• complaints in some local newspapers; and

• survey on customer satisfaction.

2.0 Installed Generation Capacity - Maximum Demand 2.1 Grid System of TNB

In the year 2004, the maximum demand of the grid system in Peninsular Malaysia grew by 6.1% from 11,329 MW in the year 2003 to 12,023 MW recorded on 13 May 2004. Although there was no addition of new generation capacity, the total generation was more than sufficient to meet the demand as the reserved margin was in the region of 40%. The total installed generation capacity had reduced from about 17,150 MW in early 2004 to 16,850 MW due to retirement of the remaining three generating units totalling 297 MW in Tuanku Jaafar Power Station (TJPS), Port Dickson in May 2004, for the construction of the second block of combined cycle unit of 750 MW under the TJPS redevelopment program of 2 x 750 MW.

Of the total installed capacity in the year 2004, 59% or 9,960 MW was owned by TNB and the remaining 6,890 MW by IPP's. Figure 1 shows the maximum demand and installed generation capacity in the year 2004.

B. ELECTRICITY SUPPLY AND DEMAND

A. INTRODUCTION

(5)

2.2 Grid System of SESB

The project for interconnecting the West Coast Grid with the East Coast Grid in Sabah is still under construction. As such the maximum demand given in this report is the arithmetic sum of the maximum demands of the West Coast Grid and the East Coast Grid. For the year 2004 this maximum demand had grew by 7.4% to 481 MW from 448 MW in year 2003. However, the total installed generation capacity had decreased to 750 MW from 782 MW in the year 2003 due to decommission of some small generating plants.

Figure 2 shows the sum of the monthly maximum demands of the West Coast Grid and the East Coast Grid and the installed generation capacity in the year 2004 and the previous 3 years.

B. ELECTRICITY SUPPLY AND DEMAND B. ELECTRICITY SUPPLY AND DEMAND

Installed Generation Capacity 17,147

17,14717,147

17,14716,850*

16,850*16,850*

16,850*16,850*

16,850*16,850*

16,850*

11,304

11,61011,726 11,948 12,023

11,727 11,925

11,722 11,856

11,653 11,638

11,372

Maximum Demand

10,598 10,656

11,218 11,329

11,04111,097 11,07110,946 11,239

11,251 10,913 11,040

9,875

10,562 10,678 10,548 10,742

10,629 10,783

10,602 10,730 10,436 10,301 9,893

9,381

9,687 9,603

9,973 9,965 9,948

9,742 9,853 9,771

10,014 9,929 10,060

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 8,000

10,000 12,000 14,000 16,000 18,000

Demand/Capacity(MW)

Month

2001 2002 2003 2004 2004 Installed Generation Capacity Figure 1 : Monthly Maximum Demand and Installed Generation Capacity of the

Grid System in Peninsular Malaysia

N.B.: (*) The reduction in capacity is due to decommissioning of 3 generating units totalling 297 MW in Tuanku Jaafar Power Station (TJPS), Port Dickson

(6)

2.3 Grid System of SESCO

In Sarawak, the maximum demand of the SESCO's grid grew by 6.5% to 685 MW from 643 MW in year 2003. However, the total installed generation capacity in Sarawak decreased by 1.4% to 855 MW from 867 MW in the year 2003.

Table 1 shows the maximum demand of the SESCO's grid system in Sarawak in the year 2004 and the previous 3 years while Figure 3 represents the monthly maximum demands of the grid system and the installed generation capacity in Sarawak in the year 2003 and 2004.

Table 1 :Maximum Demand of Sarawak Electricity Supply Corporation (SESCO) System in the Year 2001 to 2004

B. ELECTRICITY SUPPLY AND DEMAND

N.B.: The grids in the West Coast and the East Coast of Sabah are not interconnected. The maximum demand shown are the arithmetic sum of the maximum demands of the two systems.

B. ELECTRICITY SUPPLY AND DEMAND

Year Maximum Demand (MW)

2001 2002 2003 2004

574 604 643 685

Month

2001 2002 2003 2004 2004 Installed Generation Capacity

750 750 750 750 750 750 750 750 750 750 750 750

449

477 467 473 481

470 480 481 474

477 462 448

384 385

448 441 446 447

422 424 413 424 432

401

358

382 381 380 385

391 385 385 383

381 361 367

348 363 364 350

348 363 366

343 363 338 335

355

Installed Generation Capacity

Maximum Demand

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 200

400 600 800

Demand/Capacity(MW)

Figure 2 : Monthly Maximum Demands for West Coast of Sabah, Tawau and Sandakan & Installed Generation Capacity

(7)

2.4 Distribution System of NUR

The electricity supply in Kulim Hi-Tech Park (KHTP) is served by NUR Distribution Sdn. Bhd. NUR Distribution purchases electricity from TNB and distributes to the consumers in KHTP. In the year 2004, the maximum demand in KHTP only grew marginally from 52 MW in the year 2003 to 54 MW.

Report On The Performance Of The Electricity Supply Services In Malaysia Year 2005 Edition 9

B. ELECTRICITY SUPPLY AND DEMAND

8 Report On The Performance Of The Electricity Supply Services In Malaysia Year 2005 Edition

B. ELECTRICITY SUPPLY AND DEMAND

Gambarajah 3 : Kehendak Maksimum Bulanan Sistem Grid SESCO dan Kapasiti Penjanaan

855 855 855 855 855 855 855 855 855 855 855 855

Installed Generation Capacity 950

550 650 750 850

450

2003 2004

581 635 626

606 585 597

623 643 625

617 629 607

648 666 670

669 645 670 680

685 662 628 648

560

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Demand/Capacity (MW)

Month

51

52 52 53 53

53 53

54 54 53 52

53

51 52 51 51

51 50

52 52

52

52 50 50

50 50

51 50

52 52

51 49 49 48 48 47

Gambarajah 4 : Kehendak Maksimum Bulanan NUR Distribution Sdn.

Bhd.

Demand (MW)

Maximum Demand

2004 Installed Generation Capacity

855 855 855 855 855 855 855 855 855 855 855 855

Installed Generation Capacity 950

550 650 750 850

450

2003 2004

581 635 626

606 585 597

623 643 625

617 629 607

648 666 670

669 645 670 680

685 662 628 648

560

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Demand/Capacity (MW)

Month

2002 2003 2004

51 53 53 53 52 52

53 54 54 53 52

53

51 52 51 51

51 50

52 52

52

52 50 50

50 50

51 50

52 52

51 49 49 48 48 47

Gambarajah 4 : Kehendak Maksimum Bulanan NUR Distribution Sdn.

Bhd.

Demand (MW)

Month

Maximum Demand

2004 Installed Generation Capacity

Figure 3 : Monthly maximum Demand of the SESCO’s Grid and Installed Generation Capacity for the Year 2004

Figure 4 : Monthly Maximum Demand of NUR Distribution Sdn. Bhd.

(8)

3.2 Energy Sales of SESB

For the year 2004, the sales of electricity by Sabah Electricity Sdn. Bhd. (SESB) had increased by 9.6% to 2,556 GWh from 2,333 GWh sold in the year 2003. The commercial sector used 37.2% of the total energy sold. This is followed by the domestic sector (31.3%), industrial sector (30.2%) and public lighting (1.4%), as shown in Figure 6. The total number of consumers of SESB had increased by 4.0 % from 322,830 in the year 2003 to 335,800 in the year 2004, comprising of domestic consumers (83.5%), commercial consumers (14.9%), public lighting (0.9%) and industrial consumers (0.8%).

B. ELECTRICITY SUPPLY AND DEMAND

3.0 Sales of Electricity 3.1 Energy Sales of TNB

In the year 2004, the total energy sold by Tenaga Nasional Berhad was 68,974 GWh, an increase of 7.3% over the 64,292 GWh sold in the year 2003. Figure 5 shows the composition of sales among different categories of consumers. Out of the total energy sold in the year 2004, the industrial sector consumed the most i.e. 51.8% while the commercial, domestic, public lighting and mining sectors consumed 29.2%, 18.2%, 1.0% and 0.1% respectively. The total number of consumers in Peninsular Malaysia in the year 2004 had increased by 3.4% to 6.0 million from 5.8 million in the year 2003. The consumers comprised of industrial (0.4%), commercial (15.6%), domestic (83.3%), public lighting (0.6%) and other customers (0.1%).

B. ELECTRICITY SUPPLY AND DEMAND

2002

0 10,000 20,000 30,000 40,000

2003 2004

Year

Energy Sales (GWh)

Industrial Commercial Domestic Public Lighting Mining 0.1%

51.8% 28.9% 18.2% 1.0%

0.1%

52.0% 28.6% 18.2% 1.2%

0.1%

52.0% 28.5% 18.3% 1.1%

Total Sales for Year 2004 = 68,974 GWh

Total Sales for Year 2003 = 64,292 GWh

Total Sales for Year 2002 = 61,509 GWh

2003 2004

2002

31.3% 1.4%

30.2% 37.2%

31.1%

30.0% 37.5%

200 400 600 800 1,000

0

Year

1.4%

1.5%

1.4%

31.7%

38.5%

28.5%

Energy Sales (GWh)

Industrial Commercial Domestic Public Lighting Total Sales for Year 2004 = 2,556 GWh

Total Sales for Year 2003 = 2,333 GWh

Total Sales for Year 2002 = 2,182 GWh

Figure 5 : Total Energy Sales (GWh) of Tenaga Nasional Berhad

Figure 6 : Total Energy Sales (GWh) of Sabah Electricity Sdn. Bhd.

(9)

3.4 Energy Sales of NUR

In the year 2004, the total energy sold in Kulim Hi-Tech Park (KHTP) by NUR Distribution Sdn.

Bhd. increased by 3.3% to 408 GWh from 395 GWh in the year 2003. Out of the total sales in 2004, 95.9% was to the industrial consumers. This is followed by commercial sector, domestic sector and public lighting at 3.1%, 0.6% and 0.4% respectively. The total number of consumers of NUR Distribution Sdn. Bhd. in the year 2004 was 1,501, an increase of 20.0%

over the 1,250 in the year 2003. These customers comprised of industrial consumers (1.5%), commercial consumers (5.5%), domestic consumers (89.6%) and public lighting (3.3%).

Figure 8 shows the energy sold in KHTP by NUR Distribution in the year 2004 and the previous 2 years.

Report On The Performance Of The Electricity Supply Services In Malaysia Year 2005 Edition 13

B. ELECTRICITY SUPPLY AND DEMAND

12 Report On The Performance Of The Electricity Supply Services In Malaysia Year 2005 Edition

3.3 Energy Sales of SESCO

The sales of electricity by Sarawak Electricity Supply Corporation in the year 2002 to 2004 are as shown in Figure 7. In the year 2004, the total energy sold by SESCO was 3,679 GWh, a 6.0% increase over the 3,471 GWh sold in the year 2003. Out of the total energy sold in year 2004, the industrial sector consumed the most at about 42.2%. This is followed by commercial sector (31.7%), domestic sector (25.0%) and public lighting (1.1%). The total number of consumers in Sarawak in the year 2004 increased by 4.0% to 400,350 from 385,000 in the year 2003. These customers comprised of industrial consumers (0.2%), commercial consumers (14.6%), domestic consumers (84.0%) and public lighting (1.2%).

B. ELECTRICITY SUPPLY AND DEMAND

2004

2002 2003

42.2%

42.5% 31.6% 24.8%

1.1%

1.1%

24.9%

31.9%

42.1%

25.0% 1.1%

31.7%

0 500 1,000 1,500 2,000

Year

Energy Sales (GWh)

Industrial Commercial Domestic Public Lighting Total Sales for Year 2004 = 3,679 GWh

Total Sales for Year 2003 = 3,471 GWh

Total Sales for Year 2002 = 3,248 GWh

2004

2002 2003

42.2%

42.5% 31.6% 24.8%

1.1%

95.9% 3.1%

0.6%

0.4%

96.6%

96.3%

2.8%

3.0%

0.2%

0.3%

0.4%

0.4%

1.1%

24.9%

31.9%

42.1%

25.0% 1.1%

31.7%

0 500 1,000 1,500 2,000

2004

2002 2003

0 100 200 300 400

Year

Year

0.4%

Energy Sales (GWh)

Industrial Commercial Domestic Public Lighting

Energy Sales (GWh)

Industrial Commercial Domestic Public Lighting Total Sales for Year 2004 = 3,679 GWh

Total Sales for Year 2003 = 3,471 GWh

Total Sales for Year 2002 = 3,248 GWh

Total Sales for Year 2004 = 408 GWh

Total Sales for Year 2003 = 395 GWh

Total Sales for Year 2002 = 379 GWh

Figure 7 : Total Energy Sales (GWh) of

Sarawak Electricity Supply Corporation Figure 8 : Total Energy Sales (GWh) of NUR Distribution

Sdn. Bhd.

(10)

C. PERFORMANCE OF TRANSMISSION SYSTEM

4.0 Performance of Transmission System 4.1 Transmission System of TNB

Among the indicators used in assessing the performance of the transmission system are :-

• delivery point unreliability index (system minutes);

• unsupplied energy during load sheddings and trippings;

• numbers of load sheddings and trippings; and

• average interruptions per delivery point

Table 2 shows the total number of trippings of the transmission network in Peninsular Malaysia with a load loss of 50 MW and above in the year 2003 and 2004 while Table 3 shows the monthly number of trippings in the year 2004.

There were 10 incidents of tripping in the year 2004 compared with 7 in the year 2003.

However the number of load shedding and unsupplied energy had reduced.

C. PERFORMANCE OF TRANSMISSION SYSTEM

Table 2 :Transmission System Trippings with a Load Loss of 50 MW and Above for the Year 2003 and 2004 in Peninsular Malaysia

Indicators 2003 2004

No. of Tripping without Load Shedding 3 9

No. of Tripping with Load Shedding 4 1

Unsupplied Energy due to Tripping (MWh) 5,673.4 596.1

Unsupplied Energy during load Shedding (MWh) 1,618.0 178.0

Table 3 :Monthly Transmission System Trippings with a Load Loss of 50 MW and Above for the Year 2004 in Peninsular Malaysia

Indicators Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec No. of Tripping without Load

Shedding 1 1 1 1 1 0 1 1 1 0 1 0

No. of Tripping with Load

Shedding 0 0 0 0 0 0 0 0 1 0 0 0

Maximum Load Losses (MW) 110 56 60 217 52 0 110 100 85 68.0

Unsupplied Energy due to

Tripping (MWh) 16.5 82.67 22 229.28 64.77 0 18.6 10 72.3 80.0

Average Unsupplied Energy

per Trip (MWh) 16.5 82.67 22 229.28 64.77 0 18.6 10 72.3 80.0

Average Duration per

Trip (Hour) 0:09 1:29 0:22 1:03 1:15 0:00 0:10 0:06 1:02 1:11

Unsupplied Energy during

Load Shedding (MWh) 0 0 0 0 0 0 0 0 178.0 0 0

(11)

C. PERFORMANCE OF TRANSMISSION SYSTEM

System minutes of the TNB's transmission system from the financial year 1998/99 to financial year 2003/04 are as shown in Figure 10. In the financial year 2003/04 system minutes of TNB's transmission system had increased to 46 minutes compared with 14 minutes in the financial year 2002/03. The increase was due to the tripping of the Bukit Beruntung - Batu Gajah lines on 1st September 2003 causing wide interruption in the Northern part of the Peninsula. This single incident accounted for 28.14 minutes of the total 46 minutes in the financial year 2003/04.

C. PERFORMANCE OF TRANSMISSION SYSTEM

4*

1 1 2

9

2001 14

12 10 8 6 4 2 0

10 9

2002 2003 2004

3

Year

No. of Tripping with Load Shedding No. of Tripping without Load Shedding

No. of Incidents

Figure 10 : System Minutes of TNB’s Transmission System

With incident on 1st September 2003

Financial Year 80

60

40

20

0

1998/99 1999/00 2000/01 2001/02 2002/03 2003/04 74

19 17 20

14 46 Delivery Point Unreliability Index (System Minutes)

System Minutes (Minutes)

N.B.: (*) Including incident of tripping on 1st September 2003

Figure 9 : Number of Transmission System Tripping with a Load Loss of 50 MW and Above for the Year 2001, 2002, 2003 and 2004

(12)

C. PERFORMANCE OF TRANSMISSION SYSTEM

4.2 Transmisssion System of SESB

The number of trippings with a load loss of 50 MW and above had increased from 2 incidents in the financial year 2003 to 3 incidents in the year 2004. Table 4 shows the numbers of SESB's transmission system trippings with a load loss of 50 MW and above in financial year 2004.

Table 4 :Statistics of Transmision System Trippings of SESB with a Load Loss of 50 MW and Above in the Financial Year 2004

System minutes of SESB's transmission system for the financial year 2004 had increased by 65% to 142 minutes from 86 minutes in the financial year 2003. Figure 11 shows the system minutes of SESB's transmission system in 2004 and the previous few years.

C. PERFORMANCE OF TRANSMISSION SYSTEM

Figure 11 : System Minutes of SESB’s Transmission System

239

490

263

86

142

Financial Year 600

400

200

0

1999/00 2000/01 2001/02 2002/03 2003/04

Delivery Point Unreliability Index (System Minutes)

System Minutes (Minutes)

Indicators Sept Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug No. of Tripping without Load

Shedding 1 0 0 0 0 0 0 0 1 1 0 0

No. of Tripping with Load

Shedding 0 0 0 0 0 0 0 0 0 0 0 0

Maximum Load Losses (MW) 218 260 131

Unsupplied Energy due to

Tripping (MWh) 335.5 241.17 82.71

Average Unsupplied Energy

per Trip (MWh) 335.5 241.17 82.71

Average Duration per

Trip (Hour) 24.1 1.41 1.35

Unsupplied Energy during

Load Shedding (MWh) 0 0 0

(13)

5.0 Performance of Distribution System

The following aspects are used to assess the performance of the distribution systems:-

• number of supply interruptions

• duration of supply interruptions

• type of supply interruptions

• causes of supply interruptions

• System Average Interruption Duration Index (SAIDI)

• System Average Interruption Frequency Index (SAIFI)

• Customer Average Interruption Duration Index (CAIDI)

• customer complaints

D. PERFORMANCE OF DISTRIBUTION SYSTEM C. PERFORMANCE OF TRANSMISSION SYSTEM

4.3 Transmission System of SESCO

The incident of trippings of SESCO's transmission system in Sarawak reduced by 57% from 21 incidents in the year 2003 to 9 incidents in the year 2004. Of the total of 9 incidents, only 1 incident involved load shedding.

Table 5 : Statistics of Monthly Transmission System Trippings in Sarawak for the Year 2004 Indicators Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec No. of Tripping without Load

Shedding 3 0 1 0 1 2 0 0 0 0 2 0

No. of Tripping with Load

Shedding 0 0 0 0 1 0 0 0 0 0 0 0

Maximum Load Losses (MW) 30 0 46 0 140 77 0 0 0 0 105 0

Unsupplied Energy due to

Tripping (MWh) 34 0 19 0 74 65 0 0 0 0 77 0

Average Unsupplied Energy

per Trip (MWh) 11 0 19 0 74 33 0 0 0 0 35 0

Average Duration per

Trip (Hour) 31 0 25 0 78 18 0 0 0 0 181 0

Unsupplied Energy during

Load Shedding (MWh) 0 0 0 0 71 0 0 0 0 0 0 0

(14)

(a) implementing various projects to strengthen the distributions network such as :-

• changing bare conductors to insulated aerial bundled cable (ABC)

• injecting new feeders

• constructing new substations

(b) enhancing preventive maintenance programmes which include :-

• scheduled preventive maintenance of substations on a continuous basis

• condition monitoring of substation equipment, lines and cables

• preventive testing of cables by very low frequency (VLF) test method

(c) reviewing manuals on operation and asset maintenance to enhance the quality of work.

D. PERFORMANCE OF DISTRIBUTION SYSTEM

5.1 Statistics of Supply Interruptions

5.1.1 Statistics of Supply Interruptions of TNB

From 1st September 2004, i.e. commencement of the 2004/2005 financial year, TNB has included interruption of supply to a single customer for more than 1 minute, which was omitted in the past, in its statistics of supply interruptions. As such for the year 2004, the number of supply interruptions per 1000 customers in TNB's distribution system in Peninsular Malaysia recorded had increased by 85.7% to 9.1 from 4.9 interruptions in year 2003. Out of the total number of supply interruptions, 96.6% was unscheduled interruptions while the remaining 3.3% was scheduled interruptions.

Figure 12 shows the numbers of supply interruptions per 1000 customers of TNB in the last 5 years. In the year 2004, the monthly average number of supply interruptions of TNB increased by 91.5% to 4,529 from 2,365 in the year 2003 as shown in Figure 13. Selangor, Wilayah Persekutuan, Kedah and Johor had the highest number of supply interruptions in the year 2004 compared with the other states.

Among the efforts being carried out by TNB to improve the reliability of the distribution system are:-

D. PERFORMANCE OF DISTRIBUTION SYSTEM

(15)

D. PERFORMANCE OF DISTRIBUTION SYSTEM D. PERFORMANCE OF DISTRIBUTION SYSTEM

N.B.:

Number of customers : 5.0 Million (Year 2000) 5.2 Million (Year 2001) 5.5 Million (Year 2002) 5.8 Million (Year 2003) 6.0 Million (Year 2004)

Gambarajah 1 : purata Bilangan Gangguan Bekalan Elektrik Bulanan TNB Pada Tahun 2004

3,471

6,882 7,891 8,818 9,847

2,814 2,692 2,488 2,874 3,012 2,677 2,113 2,240 4,529

2,365 2,300

Change in reportin g system to include interruptions of more than 1 minute to single customer, which were previously omitted

2001 Month lyAverage

2002 Month lyAverage

2003 Month lyAverage

2004 Month

lyAverage Jan Feb Mar April Month

Number

May Jun Jul Aug Sep Oct Nov Dec 12,000

10,000

8,000

6,000

4,000

2,000

0 9.7

8.8 4.5 4.5

7.0

0.4 0.3 0.5

1.2 1.0

9.1 5.0 4.9

8.0 11.0

Unscheduled interruptions of TNB

Scheduled Interruptions of TNB

NumberNumber

2000 2001 2002

Year

2003 2004

2000 2001 2002

Year

2003 2004

Total Interruptions of TNB

Number

2000 2001 2002

Year

2003 2004

Figure 13 :Monthly Supply Interruptions of TNB in 2004 Figure 12 : Number of Electricity Supply Interruptions Per 1000 Customers of TNB from

the Year 2000 to 2004

(16)

5.1.2 Statistics of Supply Interruptions of SESB

In the year 2004, the total numbers of electricity supply interruptions per 1000 customers of SESB in Sabah was 47.3, an increase of 52.1% over the 31.1 interruptions recorded in the year 2003. Out of the total number of interruptions, 42.4 or 89.6% was unscheduled interruptions and the remaining 10.4% was scheduled interruptions. Figure 15 shows the number of electricity supply interruptions per 1000 customers of SESB in Sabah in the year 2004 compared with the previous few years.

The monthly average number of supply interruptions in Sabah had also increased by 58% from 838 in the year 2003 to 1,325 in the year 2004 as shown in Figure 16.

D. PERFORMANCE OF DISTRIBUTION SYSTEM D. PERFORMANCE OF DISTRIBUTION SYSTEM

Gambarajah 14 : Jumlah Kumulatif Bilangan Gangguan Bekalan Elektrik bagi Negeri-Negeri di Semenanjung Malaysia Pada Tahun

2003 dan 2004

358 5,6111,250

1,956699

1,5641,409

7,1314,222

2,2411,702

3,3002,261

12

4,979

2,592 6,175 8,922

1,7261,007

1,831 7,241

472 7,9976,052

8,000

6,000

4,000 10,000

2,000

Number 16

2003 2004

0

Perlis Kedah Penang Perak Selangor W.P.Kuala Lumpur Putrajaya N. Sembilan Malacca Johore Pahang Terengganu Kelantan

State

Figure 14 :Total Number of Supply Interruptions in Various States in Peninsular Malaysia in the Year 2003 and 2004

(17)

N.B.:

Number of Customers : 290,412 (Year 2000) 302,981 (Year 2001) 313,381 (Year 2002) 322,830 (Year 2003) 335,800 (Year 2004)

D. PERFORMANCE OF DISTRIBUTION SYSTEM D. PERFORMANCE OF DISTRIBUTION SYSTEM

31.6

42.4 26.9 28.5

30.4

5.0

2.6 3.3

4.1 4.1

47.3 30.2 31.1

35.7 34.5

Unscheduled Interruptions of SESB

Scheduled Interruptions of SESB

Total Interruptions of SESB

Year

Year

Year

NumberNumberNumber

2000 2001 2002 2003 2004

2000 2001 2002 2003 2004

2000 2001 2002 2003 2004

Figure 15 : Number of Electricity Supply Interruptions Per 1000 Customers of SESB from the Year 2000 to 2004

2001 Monthly Average

2002 Monthly Average

2003 Monthly Average

2004 Monthly Average

Jan Feb Mar Apr May June Jul Aug Sept Oct Nov Dec

Month 1,800

1,600 1,400 1,200 1,000 800 600 400 200 0

Number 870 788 838 1,325 755 967 974 1,081 1,433 1,601 1,334 1,531 1,633 1,590 1,524 1,477

Figure 16 :Monthly Supply Interruptions of SESB in 2004

(18)

D. PERFORMANCE OF DISTRIBUTION SYSTEM D. PERFORMANCE OF DISTRIBUTION SYSTEM

5.1.3 Statistics of Supply Interruptions of SESCO

In Sarawak, the numbers of electricity supply interruptions per 1000 customers for the year 2004 had increased by 4.0% to 10.6 interruptions from 10.2 interruptions in the year 2003.

Table 6 and Figure 17 show the numbers of electricity supply interruptions per 1000 customers in Sarawak in the year 2004 compared with the previous few years. Of the total numbers of interruptions, 8.2 or 77.4% was unscheduled interruptions and the remaining 22.6% was scheduled interruptions.

The monthly average of supply interruptions in Sarawak for the year 2004 had also increased by 8.3% to 354 from 327 in the year 2003 as shown in Figure 18.

Table 6 :Number of Electricity Supply Interruptions Per 1000 Customers of SESCO for the Year 2001 to 2004

Year No. of Interruptions Per 1000 Customers 2001

2002 2003 2004

17.6 11.5 10.2 10.6

8.5

10.2 10.6

2.4 1.7

8.2 Unscheduled interruptions of SESCO

Scheduled Interruptions of SESCO

Total Interruptions of SESCO

Year

Number

Year

Number

Year

Number

2004 2003

2004 2003

2004 2003

Figure 17 : Number of Electricity Supply Interruptions Per 1000 Customers of SESCO in the Year 2003 and 2004

(19)

5.1.4 Statistics of Supply Interruptions of NUR Distribution

Figure 18 shows the number of electricity supply interruptions per 1000 customers in Kulim Hi- Tech Park for the past few years. The numbers of supply interruptions per 1000 customers in the year 2004 had increased by 33.2% to 79.9 from 60.0 interruptions in the previous year.

The monthly average number of supply interruptions in Kulim Hi-Tech Park in the year 2004 had increased to 10 from 6 incidents in the year 2003, as shown in Figure 20.

D. PERFORMANCE OF DISTRIBUTION SYSTEM D. PERFORMANCE OF DISTRIBUTION SYSTEM

N.B.:

Numbers of customers 341,224 (Year 2001) 361,545 (Year 2002) 385,003 (Year 2003) 400,348 (Year 2004)

Gambarajah 18 : Purata Bilangan Gangguan Bekalan Elektrik Bulanan SESCO Pada Tahun 2004

347

400 383 388 432

375 398

280 381

338 285 287

297 354 327

2002 Monthly Average

Month 2003 Monthly

Average

2004 Monthly Average

Jan Feb Mar April May Jun Jul Aug Sep Oct Nov Dec

Number

0 50 100 150 200 250 300 350 400 450

Figure 18 :Monthly Supply Interruptions of SESCO in 2004

(20)

D. PERFORMANCE OF DISTRIBUTION SYSTEM D. PERFORMANCE OF DISTRIBUTION SYSTEM

Figure 19 : Number of Electricity Supply Interruptions Per 1000 Customers in Kulim Hi-Tech Park for the Years 2000 to 2004

58.6

22.4 26.0 36.9 32.3

40.4 37.6 36.9

41.4 54.0

72.7 79.9

60.0 73.9

100.0

Number

2000 2001 2002

Year

2003 2004

Number

2000 2001 2002

Year

2003 2004

Number

2000 2001 2002

Year

2003 2004

Unscheduled Interruptions of NUR Distribution Sdn. Bhd.

Scheduled Interruptions of NUR Distribution Sdn. Bhd.

Total Interruptions of NUR Distribution Sdn. Bhd.

Gambarajah 20 : Purata Bilangan Gangguan Bekalan elektrik Bulanan NUR Distribution Sdn. Bhd. Tahun 2004

2001 Monthly Average

2002 Monthly Average

2003 Monthly Average

2004 Monthly Average

Jan Feb Mar April May Jun Jul Aug Sep Oct Nov Dec

Year

Number

0 2

4 5 6

10 14

6 9

11

5 14

5 12

15

9 13

7

4 6 8 10 12 14 16

N.B.:

Numbers of customers 290 (Year 2000) 704 (Year 2001) 867 (Year 2002) 1,250 (Year 2003) 1,501 (Year 2004)

Figure 20 :Monthly Supply Interruptions of NUR Distribution Sdn. Bhd. in 2004

(21)

D. PERFORMANCE OF DISTRIBUTION SYSTEM

5.2 Distribution System of TNB

5.2.1 System Average Interruption Duration Index (SAIDI)

Reliability of electricity supply is normally measured by the duration and frequency of interruptions of supply experienced by customers. System Average Interruption Duration Index (SAIDI) represents the total duration in minutes on average that a customer is without supply in a certain period, normally a year.

Figure 21 shows the SAIDI of TNB in various states in Peninsular Malaysia in the last 3 years.

The SAIDI in the year 2004 for most of the states in Peninsula, with the exception of Johore, Terengganu and Kedah, had reduced compared with the year 2003.

For the year 2004, the overall SAIDI of TNB had reduced by 22.8% from 167.6 minutes in the year 2003 to 129.0 minutes. This reflects an improvement in the performance of the supply system of TNB in the year 2004. The monthly SAIDI in Peninsular Malaysia in the year 2004 are as shown in Figure 22.

D. PERFORMANCE OF DISTRIBUTION SYSTEM

Gambarajah 21 : Indeks SAIDI (Minit/Pelanggan/Tahun) untuk Negeri-negeri di Semenanjung Malaysia bagi Tahun 2002,

2003 dan 2004

0 50 100 150 200 250 300 350

128.0

54.7

250.8 35

161.4 173.3 90

67.6

330.0 74.6

114.8 162.3 119.9 110.1 95.8

146.9 98.9

101.2 82.5 1.6

35.2 0

85.7 77.8

119.6 103 52.1 78.7

213.8 180.2

183.8 140.7

261.7 280.3 177.3

167.5 207.8 136

207.7 105

129.0 167.6

Kelantan Semenanjung Malaysia

Terengganu Pahang Johore Malacca N. Sembilan Putrajaya W.P. Kuala Lumpur Selangor Perak Penang Kedah Perlis

State

SAIDI

2002 2003 2004

Figure 21 : SAIDI (Minutes/Customer/Year) for the Various States in Peninsular Malaysia for the Year 2002, 2003 and 2004

(22)

5.2.2 System Average Interruption Frequency Index (SAIFI)

The System Average Interruption Frequency Index (SAIFI) represents the number of occasions per year a customer experienced supply interruption. The SAIFI for the various states in Peninsular Malaysia in the year 2004 are as shown in Figure 23 while Figure 24 shows the monthly SAIFI in Peninsular Malaysia in the year 2004.

In the year 2004, the overall SAIFI in Peninsular Malaysia had dropped to 1.30 compared with 1.69 in the previous year. Terengganu, Kedah and Johor recorded higher SAIFI compared with the other states.

D. PERFORMANCE OF DISTRIBUTION SYSTEM

Gambarajah 22 : Indeks SAIDI Bulanan di Semenanjung Malaysia Pada Tahun 2004

0.0 180.0 160.0 140.0 120.0 100.0 80.0 60.0 40.0 20.0

128.0 13.310.99.510.6

7.99.4

9.09.9

9.410.1

129.0

167.6*

119.5 14.914.2

2002 SAIDI2003 SAIDI2003 SAIDI2004 SAIDI

Jan Feb Mar April May Jun July Aug Sept Oct Nov Dec

Month

SAIDI

N.B.: * With incident of tripping on 1st September 2003

Figure 22 :Monthly SAIDI in Peninsular Malaysia for the Year 2004

D. PERFORMANCE OF DISTRIBUTION SYSTEM

(23)

D. PERFORMANCE OF DISTRIBUTION SYSTEM D. PERFORMANCE OF DISTRIBUTION SYSTEM

N.B.: * With incident of tripping on 1st September 2003

Gambarajah 24 : SAIFI Bulanan di Semenanjung Malaysia Pada Tahun 2004

1.30 0.130.130.110.100.090.090.110.090.100.100.11

1.69*

1.39 1.30 0.14

1.80 1.60 1.40 1.20 1.00 0.80 0.60 0.40 0.20 0.00

2002 SAIFI

Month

SAIFI

2003 SAIFI 2003 SAIFI 2004 SAIFI

Jan Feb Mar April May Jun Jul Aug Sept Oct Nov Dec Gambarajah 25 : Indeks CAIDI bagi Negeri-Negeri di

Semenanjung Malaysia Pada Tahun 2003 dan 2004

Peninsular Malaysia Kelantan Terengganu Pahang Johore Malacca N. Sembilan Putrajaya W.P. Kuala Lumpur Selangor Perak Penang Kedah Perlis

State

0.00 1.00 2.00 3.00 4.00

2.04 1.65

2.87 2.26

2.65 1.19

1.98 1.80

2.14 1.08

0.71 0.79 0.65 0.01

0.57 0.84

1.06 0.95 0.86

1.59 2.11 0.97

2.00 1.89

2.52 1.26

1.30 1.69

SAIFI

2003 2004

Figure 23 : SAIFI for the Various States in Peninsular Malaysia for the

Year 2003 and 2004 Figure 24 : Monthly SAIFI in Peninsular Malaysia for the Year 2004

(24)

D. PERFORMANCE OF DISTRIBUTION SYSTEM

5.2.3 Customer Average Interruption Duration Index (CAIDI)

Apart from the SAIDI and SAIFI, the performance of the electricity supply system is also measured using the Customer Average Interruption Duration Index (CAIDI), which represents the average time taken for supply to be restored to a customer after an interruption has occurred.

Figure 25 shows the CAIDI for the various states in Peninsular Malaysia in the year 2004 whereas Figure 26 shows the monthly CAIDI in Peninsular Malaysia. The overall CAIDI in Peninsular Malaysia for the year 2004 was 99.3 minutes, which is almost the same as the previous year of 99.2 minutes. Putrajaya, Johore, Pahang and W.P. Kuala Lumpur recorded higher CAIDI compared with other states.

D. PERFORMANCE OF DISTRIBUTION SYSTEM

Gambarajah 25 : Indeks CAIDI bagi Negeri-Negeri di Semenanjung Malaysia Pada Tahun 2003 dan 2004

Peninsular Malaysia Kelantan Terengganu Pahang Johore Malacca N. Sembilan

Putrajaya W.P. Kuala Lumpur Selangor Perak Penang Kedah Perlis

State

0 50 100 150 200

123.0 82.4 72.4

78.4 63.2

118.2 132.2 118.8 84.2

95.5 110.9 108.4

119.7

164.0 61.8

117.7 95.5

115.9 111.4 72.2

76.9 69.7

165.0 85.4

68.8 43.4

99.3 99.2

CAIDI ( in Minutes)

2003 2004

Figure 25 : CAIDI for the Various States in Peninsular Malaysia for the Year 2003 and 2004

(25)

5.3 Distribution System of SESB

5.3.1 System Average Interruption Duration Index (SAIDI)

In Sabah, the SAIDI in the year 2004 had increased by 50.0% from 1,729 minutes in the year 2003 to 2,594 minutes. This reflects a drop in the performance of the supply system of SESB in the year 2004 compared with the previous year.

The SAIDI for SESB in Sabah in the year 2004 and the previous 2 years are as shown in Figure 27.

D. PERFORMANCE OF DISTRIBUTION SYSTEM D. PERFORMANCE OF DISTRIBUTION SYSTEM

Gambarajah 26 : CAIDI Bulanan di Semenanjung Malaysia Pada Tahun 2004

98.5 99.0

94.0 95.5 112.2 88.7 92.2

94.8 96.3 94.6 92.1

99.3 99.2*

85.6

102.8 106.0 120

100

80 60

40 20

0

2002 CAIDI

Month

CAIDI (in Minutes)

2003 CAIDI2003 CAIDI2004 CAIDI

Jan Feb Mar April May Jun Jul Aug Sept Oct Nov Dec

N.B.: * With incident of tripping on 1st September 2003

Figure 26 :Monthly CAIDI in Peninsular Malaysia for the Year 2004

(26)

5.3.2 System Average Interruption Frequency Index (SAIFI)

The monthly System Average Interruption Frequency Index (SAIFI) of SESB in the year 2003 and 2004 are as shown in Figure 28. The overall SAIFI for the state in Sabah had also increased from 18.77 in the year 2003 to 25.79 in the year 2004. The SAIFI in the months of June and August were higher compared with other months.

D. PERFORMANCE OF DISTRIBUTION SYSTEM D. PERFORMANCE OF DISTRIBUTION SYSTEM

Gambarajah 27 : Indeks SAIDI (Minit/Pelanggan/Tahun) bagi Negeri Sabah Pada Tahun 2002, 2003 dan 2004

0 500 1000 1500 2000 2500 3000

141 124 80 60113151

137 267 195

234 181 144

141 126

241

158 108

135 109 157 143

183 159234 109149416

158179 293 151 99 205

163 176285

1,779

1,729 2,594

2004 2003

2002 SAIDI (Jan - Dec)

Dec Nov Oct Sept Aug Jul Jun May Apr Mar Feb Jan

Month

SAIDI

2.20 1.78

2.80 1.21

2.06 1.89 1.52

1.76 3.43 1.90 2.05 1.66

3.25 1.83

2.57 1.45 1.33 1.26 1.54 1.41 1.75 1.42 1.29 1.20

25.79 18.77

Gambarajah 28 : Indeks SAIFI Bulanan di Negeri Sabah Pada Tahun 2003 dan 2004

0305 10 15 20 25

SAIFI ( Jan-Dec)

Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec

Month

SAIFI

2003 2004

Figure 27 : SAIDI (Minutes/Customer/Year) for the State of Sabah for the Year 2002, 2003 and 2004

Figure 28 :Monthly SAIFI in Sabah for the Year 2003 and 2004

2.20 1.78

2.80 1.21

2.06 1.89 1.52

1.76 3.43 1.90

2.05 1.66

3.25 1.83

2.57 1.45 1.33 1.26 1.54 1.41 1.75 1.42 1.29 1.20

25.79 18.77

Gambarajah 28 : Indeks SAIFI Bulanan di Negeri Sabah Pada Tahun 2003 dan 2004

0 5 10 15 20 25 30

SAIFI ( Jan-Dec)

Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec

Month

SAIFI

2003 2004

(27)

D. PERFORMANCE OF DISTRIBUTION SYSTEM D. PERFORMANCE OF DISTRIBUTION SYSTEM

5.3.3 Customer Average Interruption Duration Index (CAIDI)

Figure 29 shows the monthly CAIDI for the supply system of SESB in the year 2003 and 2004.

The overall CAIDI for the state of Sabah in the year 2004 had increased to 100.6 minutes from 92.1 minutes in the year 2003. The CAIDI in the months of September and October were higher compared with other months in the year.

80.2 98.9 81.8 81.2

102.9 94.8

118.0 84.1

68.2 83.4

94.8 86.9 82.0

99.0 90.9

96.9 94.4 86.2 70.9

111.6 86.8 79.5 62.1

103.1 100.6 92.1

0 20 40 60 80 100 120

CAIDI ( Jan-Dec)

Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec

2003 2004

140 Gambarajah 29 : Indeks CAIDI Bulanan di Negeri Sabah

Pada Tahun 2003 dan 2004

Month

CAIDI (in Minutes)

5.4 Distribution System of SESCO

5.4.1 System Average Interruption Duration Index (SAIDI)

The SAIDI of SESCO's supply system in Sarawak in the year 2004 had reduced by 22.2% to 325 minutes from 418 minutes in the year 2003. This reflects an improved performance over the previous few years.

Table 7 shows the SAIDI of SESCO in the year 2004 compared with the previous years, while Figure 30 shows the monthly SAIDI in the year 2003 and 2004.

Table 7 :SAIDI (Minutes/Customers/Year) of SESCO for the year 2001 to 2004

Year SAIDI (Minutes)

2001 2002 2003 2004

731 610 418 325 Figure 29 :Monthly CAIDI in Sabah for the Year 2003 and 2004

80.2 98.9 81.8 81.2

102.9 94.8

118.0 84.1

68.2 83.4

94.8 86.9 82.0

99.0 90.9

96.9 94.4 86.2 70.9

111.6 86.8

79.5 62.1

103.1 100.6 92.1

0 20 40 60 80 100 120

CAIDI ( Jan-Dec)

Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec

2003 2004

140 Gambarajah 29 : Indeks CAIDI Bulanan di Negeri Sabah

Pada Tahun 2003 dan 2004

Month

CAIDI (in Minutes)

(28)

D. PERFORMANCE OF DISTRIBUTION SYSTEM D. PERFORMANCE OF DISTRIBUTION SYSTEM

38.3 27.0

34.7 39.7 33.0 29.0 25.5 33.9 17.3

38.7 24.7

35.0 25.6 28.6 30.9

46.3 32.9 32.1 15.5

43.4 20.9 26.8 26.0 37.2

325 418

0 100 200 300 400 500

SAIDI ( Jan-Dec)

Jan Feb Mar

Apr May Jun Jul Aug Sept Oct Nov Dec

2003 2004

Gambarajah 30 : Indeks SAIDI (Minit/Pelanggan/Tahun) bagi SESCO Pada Tahun 2003 dan 2004

Month

SAIDI

5.5 Distribution System of NUR

5.5.1 System Average Interruption Duration Index (SAIDI)

Table 8 and Figure 31 show the yearly and monthly SAIDI of the supply system in Kulim Hi- Tech Park respectively.

The SAIDI had reduced by 71.9% from 135 minutes in the year 2003 to 38 minutes in the year 2004. This reduction reflects significant improvement in the performance of the electricity supply in a high technology industrial park in the last few years.

Table 8 :SAIDI (Minutes/Customers/Year) of NUR Distribution Sdn. Bhd.

for the Year 2001 to 2004

Year SAIDI (Minutes)

2001 2002 2003 2004

627 189 135 38 Figure 30 : SAIDI (Minutes/Customer/Year) in Sarawak for the Year 2003

and 2004

(29)

D. PERFORMANCE OF DISTRIBUTION SYSTEM D. PERFORMANCE OF DISTRIBUTION SYSTEM

Gambarajah 31 : Indeks SAIDI (Minit/Pelanggan/Tahun) NUR Distribution Sdn. Bhd Pada Tahun 2003 dan 2004

0.00 50.00 100.00 150.00

0

38.0

135.4 0.03

0.05 0.27 0.70 0.25 1.67 3.07 0.55 0.12

0.22 0.25

11.61 22.05

0 1.59

4.93

61.66 0.17

1.07 5.32 0.16 0

57.64

2003 2004

SAIDI ( Jan-Dec)

Jan <

Rujukan

DOKUMEN BERKAITAN

3.4 Will students with high language anxiety (HL) using the Text + Sound + Phonetic Symbols + Face Gestures (TSPF) mode attain significantly higher achievement scores (AS) than

The construction of numbers will be started with natural numbers, and then extended to the integers, rational numbers and finally the real numbers...

In this thesis, the soliton solutions such as vortex, monopole-instanton are studied in the context of U (1) Abelian gauge theory and the non-Abelian SU(2) Yang-Mills-Higgs field

Natural pigments: Carotenoids, anthocyanins and betalains – Characteristics, biosynthesis, processing and stability.. Pharmaceutically active secondary metobolites of

Figure 6.48 Differential cross section of neutron candidates with respect to its measured momentum momentum (pb/GeV) vs its energy

Secondly, the methodology derived from the essential Qur’anic worldview of Tawhid, the oneness of Allah, and thereby, the unity of the divine law, which is the praxis of unity

In the researcher‟s previous study, it has been identified that Shakespeare uses 121 puns in 154 sonnets. Puns are extremely difficult to translate. Inevitably, the translators

The extracts obtained were examined for hypoglycaemic activity in normal rats, inhibition of the rise of blood glucose level in intraperitoneal glucose tolerance test (IPGTT)